IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,754

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0004 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,687 $5,993 Not Implemented
NT0004 # 02 Y:2023 02 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $38,000 $38,000 Not Implemented
NT0004 # 03 Y:2023 03 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $29,874 $0 Not Implemented
NT0004 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $27,237 $63,579 Not Implemented
NT0004 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $735 $0 Not Implemented
NT0004 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $27,449 $0 Not Implemented
NT0004 # 07 Y:2023 07 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $18,694 $0 Not Implemented
LT8376 # 01 Y:2023 01 2023 USE RADIANT HEATER FOR SPOT HEATING $7,532 $8,500 n/a
LT8376 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,255 $210 n/a
LT8376 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,881 $31,854 n/a
TT0292 # 01 Y:2023 01 2023 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $28,974 $250 Not Implemented
TT0292 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,314 $15,941 Implemented
TT0292 # 03 Y:2023 03 2023 AIR CONDITION ONLY SPACE NECESSARY $8,884 $18,000 Implemented
TT0292 # 04 Y:2023 04 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,900 $600 Not Implemented
TT0292 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,004 $4,240 Not Implemented
TT0292 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,057 $2,190 Implemented
TT0292 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,223 $4,750 Implemented
TT0292 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,268 $50 Implemented
IP0171 # 01 Y:2023 01 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,033 $0 Not Implemented
IP0171 # 02 Y:2023 02 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $18,240 $0 Not Implemented
IP0171 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,706 $517 Not Implemented
IP0171 # 04 Y:2023 04 2023 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $261 $38 Not Implemented
IP0171 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,539 $915 Not Implemented
IP0171 # 06 Y:2023 06 2023 RECOVER WASTE HEAT FROM EQUIPMENT $4,171 $1,316 Not Implemented
IP0171 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,840 $69,000 Not Implemented