IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

252

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0531 # 04 Y:2016 04 2016 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,855 $6,757 Not Implemented
SD0531 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,174 $2,000 Implemented
SD0531 # 02 Y:2016 02 2016 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $5,588 $3,308 Implemented
SD0531 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,781 $24,125 Implemented
SD0528 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,000 $200 Not Implemented
SD0528 # 05 Y:2016 05 2016 INSTALL TIMERS AND/OR THERMOSTATS $8,651 $1,032 Not Implemented
SD0528 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,638 $43,142 Implemented
SD0528 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,641 $1,700 Implemented
SD0528 # 11 Y:2016 11 2016 USE PHOTOCELL CONTROLS $157 $185 Not Implemented
SD0528 # 10 Y:2016 10 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,512 $200 Not Implemented
SD0528 # 09 Y:2016 09 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,286 $4,076 Not Implemented
SD0528 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $4,725 $7,800 Not Implemented
SD0528 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,400 $1,300 Not Implemented
SD0528 # 02 Y:2016 02 2016 REDUCE SCRAP PRODUCTION $22,801 $25,619 Not Implemented
SD0528 # 01 Y:2016 01 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $117,397 $321,940 Not Implemented
SD0486 # 02 Y:2014 02 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $54,581 $250,000 Not Implemented
SD0486 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $427 $600 Not Implemented
SD0486 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,270 $600 Not Implemented
SD0486 # 04 Y:2014 04 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,957 $4,985 Not Implemented
SD0486 # 01 Y:2014 01 2014 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $75,586 $286,300 Not Implemented
SD0486 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,274 $22,000 Not Implemented
SD0486 # 03 Y:2014 03 2014 REDUCE SCRAP PRODUCTION $29,967 $30,993 Not Implemented
SD0479 # 02 Y:2014 02 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $67,610 $30,440 Not Implemented
SD0479 # 04 Y:2014 04 2014 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $28,012 $38,000 Not Implemented
SD0479 # 01 Y:2014 01 2014 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $360,753 $1,272,000 Not Implemented