Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
252
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0531 # 04 Y:2016 | 04 | 2016 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,855 | $6,757 | Not Implemented |
SD0531 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,174 | $2,000 | Implemented |
SD0531 # 02 Y:2016 | 02 | 2016 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $5,588 | $3,308 | Implemented |
SD0531 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,781 | $24,125 | Implemented |
SD0528 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,000 | $200 | Not Implemented |
SD0528 # 05 Y:2016 | 05 | 2016 | INSTALL TIMERS AND/OR THERMOSTATS | $8,651 | $1,032 | Not Implemented |
SD0528 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,638 | $43,142 | Implemented |
SD0528 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,641 | $1,700 | Implemented |
SD0528 # 11 Y:2016 | 11 | 2016 | USE PHOTOCELL CONTROLS | $157 | $185 | Not Implemented |
SD0528 # 10 Y:2016 | 10 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,512 | $200 | Not Implemented |
SD0528 # 09 Y:2016 | 09 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,286 | $4,076 | Not Implemented |
SD0528 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $4,725 | $7,800 | Not Implemented |
SD0528 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,400 | $1,300 | Not Implemented |
SD0528 # 02 Y:2016 | 02 | 2016 | REDUCE SCRAP PRODUCTION | $22,801 | $25,619 | Not Implemented |
SD0528 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $117,397 | $321,940 | Not Implemented |
SD0486 # 02 Y:2014 | 02 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $54,581 | $250,000 | Not Implemented |
SD0486 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $427 | $600 | Not Implemented |
SD0486 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,270 | $600 | Not Implemented |
SD0486 # 04 Y:2014 | 04 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,957 | $4,985 | Not Implemented |
SD0486 # 01 Y:2014 | 01 | 2014 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $75,586 | $286,300 | Not Implemented |
SD0486 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,274 | $22,000 | Not Implemented |
SD0486 # 03 Y:2014 | 03 | 2014 | REDUCE SCRAP PRODUCTION | $29,967 | $30,993 | Not Implemented |
SD0479 # 02 Y:2014 | 02 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $67,610 | $30,440 | Not Implemented |
SD0479 # 04 Y:2014 | 04 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $28,012 | $38,000 | Not Implemented |
SD0479 # 01 Y:2014 | 01 | 2014 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $360,753 | $1,272,000 | Not Implemented |