Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,971

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0572 # 07 Y:2022 07 2022 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,245 $11,975 Implemented
UF0572 # 08 Y:2022 08 2022 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,635 $4,650 Implemented
UF0572 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $56,857 $359,360 Implemented
UF0572 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $27,950 $26,859 Implemented
UF0572 # 03 Y:2022 03 2022 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $4,159 $10,627 Implemented
CW0120 # 01 Y:2021 01 2021 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $30,000 $70,084 Implemented
CW0120 # 02 Y:2021 02 2021 INSTALL BACK-UP EQUIPMENT $32,054 $93,000 Implemented
CW0120 # 03 Y:2021 03 2021 USE BATTERY STORAGE FOR DEMAND CONTROL $18,089 $25,885 Implemented
CW0120 # 04 Y:2021 04 2021 MODIFY STARTUP/SHUTDOWN TIMES $2,380 $100,000 Implemented
CW0120 # 05 Y:2021 05 2021 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,965 $510 Implemented
CW0120 # 06 Y:2021 06 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $899 $0 Implemented
CW0120 # 07 Y:2021 07 2021 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,000,000 $122,000 Implemented
CW0120 # 08 Y:2021 08 2021 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $217 $86 Implemented
IP0152 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $236 $35 Not Implemented
IP0152 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $80 $97 Not Implemented
IP0152 # 03 Y:2021 03 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $22,427 $10,500 Not Implemented
IP0152 # 04 Y:2021 04 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,039 $1,254 Not Implemented
IP0152 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $268 $867 Not Implemented
UA0248 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,182 $9,020 Implemented
UA0248 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,679 $2,002 Implemented
UA0248 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,366 $100 Not Implemented
UA0248 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $94 $274 Implemented
TT0263 # 04 Y:2021 04 2021 ADOPT IN-HOUSE MATERIAL GENERATION $9,686 $17,700 Not Implemented
TT0263 # 01 Y:2021 01 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $45,807 $72,000 Not Implemented
TT0263 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,663 $88,815 Implemented