IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

252

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0358 # 08 Y:2008 08 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,224 $5,375 Implemented
SF0358 # 09 Y:2008 09 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,062 $2,259 Implemented
SF0358 # 10 Y:2008 10 2008 INSTALL OCCUPANCY SENSORS $11,328 $26,035 Not Implemented
SF0358 # 11 Y:2008 11 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,117 $2,180 Not Implemented
SF0358 # 12 Y:2008 12 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $606 $2,130 Implemented
SF0358 # 13 Y:2008 13 2008 INSULATE BARE EQUIPMENT $2,327 $8,208 Implemented
SF0358 # 14 Y:2008 14 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,884 $150,000 Not Implemented
SF0358 # 15 Y:2008 15 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,657 $97,375 Not Implemented
SF0358 # 16 Y:2008 16 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,581 $35,183 Not Implemented
SD0403 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $148,069 $13,073 Implemented
SD0403 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,157 $15,033 Implemented
SD0403 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,381 $13,275 Implemented
SD0403 # 04 Y:2008 04 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,873 $6,500 Not Implemented
SD0403 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $58,026 $12,356 Not Implemented
SD0392 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,246 $20,870 Not Implemented
SD0392 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,991 $7,991 Not Implemented
SD0392 # 03 Y:2007 03 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,417 $17,500 Not Implemented
SD0392 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,970 $0 Not Implemented
LM0102 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,202 $500 Implemented
LM0102 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,058 $1,000 Implemented
LM0102 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,712 $200 Implemented
LM0102 # 04 Y:2005 04 2005 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $450,000 $15,000 Not Implemented
LM0102 # 05 Y:2005 05 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,258,000 $1,250,000 Implemented
LM0098 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,551 $700 Implemented
LM0098 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $148 $308 Not Implemented