IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0023 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,027 $132,430 Implemented
NL0023 # 03 Y:2018 03 2018 RECOVER AND REUSE WASTE MATERIAL $2,484 $7,000 Implemented
NL0023 # 02 Y:2018 02 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,100 $0 Not Implemented
NL0023 # 04 Y:2018 04 2018 METER WASTE WATER $320 $0 Not Implemented
IA0497 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,468 $1,500 Implemented
IA0497 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,881 $4,000 Not Implemented
IA0497 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,214 $1,720 Implemented
IA0497 # 03 Y:2013 03 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,575 $3,675 Not Implemented
IA0497 # 02 Y:2013 02 2013 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,463 $2,391 Not Implemented
IA0497 # 01 Y:2013 01 2013 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $19,923 $46,094 Implemented
IA0497 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $7,000 $7,560 Not Implemented
IA0445 # 02 Y:2009 02 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $962 $81 Not Implemented
IA0445 # 09 Y:2009 09 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $134 Not Implemented
IA0445 # 08 Y:2009 08 2009 REDUCE VENTILATION AIR $18,248 $20,000 Not Implemented
IA0445 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,414 $25 Not Implemented
IA0445 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,637 $506 Not Implemented
IA0445 # 05 Y:2009 05 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,180 $560 Not Implemented
IA0445 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $5,460 $100 Not Implemented
IA0445 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $1,603 $4,551 Not Implemented
IA0445 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,949 $19,383 Not Implemented
IA0433 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,195 $54 Implemented
IA0433 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $13,871 $1,700 Not Implemented
IA0433 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,324 $37,346 Not Implemented
IA0433 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,886 $832 Implemented
IA0433 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,622 $459 Implemented