IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

289

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1514 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,139 $896 Implemented
UK1514 # 07 Y:2015 07 2015 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $925 $343 Implemented
UK1514 # 04 Y:2015 04 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,710 $424 Not Implemented
MZ0188 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,967 $10,000 Not Implemented
MZ0188 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,385 $0 Implemented
MZ0188 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,249 $1,000 Implemented
MZ0188 # 04 Y:2015 04 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,811 $0 Implemented
UD0936 # 06 Y:2015 06 2015 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $39,316 $29,746 Not Implemented
UD0936 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,704 $6,000 Not Implemented
UD0936 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $530 $1,480 Implemented
UD0936 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,271 $85,000 Implemented
UD0936 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,695 $0 Implemented
UD0936 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $22,431 $2,260 Implemented
UD0936 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,661 $825 Not Implemented
UD0936 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $4,331 $6,300 Not Implemented
UD0936 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,521 $1,000 Implemented
UM0463 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150,724 $565,274 Implemented
UM0463 # 01 Y:2015 01 2015 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $1,052,850 $1,822,453 Not Implemented
UM0463 # 04 Y:2015 04 2015 CONVERT TO OXYFUEL BURNERS $3,052,580 $1,000,000 Not Implemented
UM0463 # 03 Y:2015 03 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,674 $4,000 Not Implemented
IA0542 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $1,556 $4,313 Not Implemented
IA0542 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,344 $35 Not Implemented
IA0542 # 05 Y:2015 05 2015 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,629 $5,844 Not Implemented
IA0542 # 09 Y:2015 09 2015 DIRECT WARMEST AIR TO COMBUSTION INTAKE $485 $180 Not Implemented
IA0542 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $905 $500 Not Implemented