IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

100

matching recommendations
Reset
NAICS 3362 Motor Vehicle Body and Trailer Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1006 # 01 Y:2019 01 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $44,647 $16,500 Implemented
UD1006 # 02 Y:2019 02 2019 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $125,929 $30,000 Not Implemented
UD1006 # 03 Y:2019 03 2019 UTILIZE A LESS EXPENSIVE COOLING METHOD $27,201 $54,202 Not Implemented
UD1006 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $50,796 $0 Not Implemented
WV0562 # 07 Y:2018 07 2018 MINIMIZE WATER USAGE $543 $2,100 Implemented
WV0562 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $2,979 $1,328 Implemented
WV0562 # 05 Y:2018 05 2018 DEVELOP A REPAIR/REPLACE POLICY $6,713 $703 Implemented
WV0562 # 04 Y:2018 04 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $10,822 $0 Implemented
WV0562 # 03 Y:2018 03 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,359 $2,000 Implemented
WV0562 # 02 Y:2018 02 2018 RECOVER WASTE HEAT FROM EQUIPMENT $16,104 $80,009 Not Implemented
WV0562 # 01 Y:2018 01 2018 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $284,971 $600,000 Not Implemented
WV0499 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,695 $3,343 Implemented
WV0499 # 10 Y:2015 10 2015 DEVELOP A REPAIR/REPLACE POLICY $781 $569 Implemented
WV0499 # 09 Y:2015 09 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $792 $0 Implemented
WV0499 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,734 $5,450 Not Implemented
WV0499 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,825 $20 Implemented
WV0499 # 05 Y:2015 05 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,187 $0 Not Implemented
WV0499 # 04 Y:2015 04 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,878 $1,000 Implemented
WV0499 # 03 Y:2015 03 2015 COMBINE UTILITY METERS $4,906 $3,200 Not Implemented
WV0499 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,029 $21,056 Not Implemented
WV0499 # 01 Y:2015 01 2015 INSULATE BARE EQUIPMENT $23,483 $3,220 Not Implemented
WV0490 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,569 $3,905 Implemented
WV0490 # 09 Y:2014 09 2014 RECOVER WASTE HEAT FROM EQUIPMENT $701 $1,075 Not Implemented
WV0490 # 08 Y:2014 08 2014 REPLACE BOILER $1,367 $5,170 Implemented
WV0490 # 06 Y:2014 06 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,812 $500 Implemented