IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

627

matching recommendations
Reset
NAICS 3362 Motor Vehicle Body and Trailer Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0519 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $770 $14 Not Implemented
AM0519 # 05 Y:2006 05 2006 INSTALL SKYLIGHTS $900 $1,500 Not Implemented
AM0519 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $575 $1,000 Not Implemented
AM0519 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $250 Implemented
AM0519 # 08 Y:2006 08 2006 PAY UTILITY BILLS ON TIME $280 $0 Implemented
AM0519 # 09 Y:2006 09 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $145 $0 Not Implemented
AM0519 # 10 Y:2006 10 2006 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $130 $0 Not Implemented
WI0522 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $69,304 $182,880 Implemented
WI0522 # 02 Y:2006 02 2006 IMPROVE SPACE COMFORT CONDITIONING $14,000 $3,000 Implemented
WI0522 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,607 $2,000 Implemented
WI0522 # 04 Y:2006 04 2006 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $7,457 $3,000 Not Implemented
WI0522 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,685 $1,920 Implemented
WI0522 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,544 $0 Implemented
WI0522 # 07 Y:2006 07 2006 DISTILL CONTAMINATED SOLVENTS FOR REUSE $4,560 $12,105 Not Implemented
BD0311 # 01 Y:2006 01 2006 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $135,621 $15,000 Not Implemented
BD0311 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $6,869 $19,000 Not Implemented
BD0311 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $30,440 $51,950 Not Implemented
BD0311 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,646 $0 Not Implemented
BD0311 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,867 $10,230 Not Implemented
BD0311 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $543 $375 Not Implemented
BD0311 # 07 Y:2006 07 2006 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $6,600 $610 Not Implemented
BD0311 # 08 Y:2006 08 2006 USE EVAPORATION TO CONCENTRATE MATERIAL $4,860 $8,000 Not Implemented
BD0311 # 09 Y:2006 09 2006 MINIMIZE WATER USAGE $656 $3,220 Not Implemented
BD0309 # 01 Y:2006 01 2006 USE RADIANT HEATER FOR SPOT HEATING $23,664 $27,472 Not Implemented
BD0309 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,400 $1,800 Implemented