IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

182

matching recommendations
Reset
NAICS 336211 Motor Vehicle Body Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0872 # 02 Y:2014 02 2014 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,062 $780 Implemented
OK0872 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,779 $1,750 Implemented
OK0872 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $883 $689 Implemented
UM0431 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $25,011 $30,000 Implemented
MZ0125 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $1,108 $480 Implemented
MZ0125 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,168 $9,300 Implemented
MZ0125 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,107 $1,300 Implemented
UM0418 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,459 $84,630 Implemented
UM0405 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,465 $1,400 Implemented
BD0384 # 01 Y:2011 01 2011 USE RADIANT HEATER FOR SPOT HEATING $50,720 $73,600 Implemented
BD0384 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,663 $45,984 Implemented
BD0384 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,049 $5,100 Implemented
BD0384 # 06 Y:2011 06 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,941 $2,000 Implemented
BD0384 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $1,067 $1,067 Implemented
BD0384 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $614 $525 Implemented
IA0449 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,171 $500 Implemented
IA0449 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,181 $650 Implemented
IA0449 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,025 $28,980 Implemented
IA0449 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $229 $1,199 Implemented
IA0449 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $5,734 $1,910 Implemented
UM0353 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $186,999 $237,500 Implemented
UM0353 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $26,834 $500 Implemented
UM0353 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $22,368 $3,000 Implemented
UM0353 # 06 Y:2009 06 2009 USE OPTIMUM TEMPERATURE $13,085 $200 Implemented
UM0353 # 08 Y:2009 08 2009 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,526 $1,500 Implemented