IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,360

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0474 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,878 $44 Implemented
WI0474 # 03 Y:2004 03 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $22,030 $17,000 Not Implemented
WI0474 # 04 Y:2004 04 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $21,301 $39 Implemented
WI0474 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,940 $790 Not Implemented
WI0474 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,067 $785 Not Implemented
MI0085 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $8,514 $2,300 Implemented
MI0085 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,699 $1,200 Implemented
MI0085 # 03 Y:2004 03 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $868 $0 Not Implemented
MI0085 # 04 Y:2004 04 2004 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $1,834 $130 Implemented
MI0085 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $-19 $2,670 Implemented
MI0085 # 06 Y:2004 06 2004 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $20,000 $0 Not Implemented
MI0085 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $263 $102 Implemented
UM0260 # 01 Y:2004 01 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $38,413 $10,000 Not Implemented
UM0260 # 02 Y:2004 02 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $33,620 $12,000 Implemented
UM0260 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,181 $13,690 Not Implemented
UM0260 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,671 $1,000 Implemented
UM0260 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,831 $2,000 Implemented
UM0260 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,283 $1,050 Implemented
UM0260 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $1,054 $1,564 Not Implemented
UU0061 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,895 $18,633 Not Implemented
UU0061 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $267 $1,000 Not Implemented
UU0061 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $274 $0 Implemented
UU0061 # 04 Y:2004 04 2004 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $18,030 $11,000 Not Implemented
UU0061 # 05 Y:2004 05 2004 CONTRACT OUT MAINTENANCE $15,000 $2,000 Not Implemented
UU0061 # 06 Y:2004 06 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $351 $432 Implemented