IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0590 # 13 Y:2020 13 2020 DEVELOP A REPAIR/REPLACE POLICY $101 $271 Implemented
NC0626 # 07 Y:2019 07 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,977 $200 Implemented
NC0626 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,170 $9,000 Not Implemented
NC0626 # 05 Y:2019 05 2019 RECOVER WASTE HEAT FROM EQUIPMENT $2,962 $4,000 Not Implemented
NC0626 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,034 $135 Implemented
NC0626 # 03 Y:2019 03 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $240 $45 Not Implemented
NC0626 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $532 $871 Not Implemented
NC0626 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,564 $40,273 Implemented
NC0543 # 07 Y:2015 07 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,398 $21,800 Not Implemented
NC0543 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,078 $68,997 Implemented
NC0543 # 02 Y:2015 02 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,971 $40,000 Not Implemented
NC0543 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,402 $100 Implemented
NC0543 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $7,041 $10,000 Not Implemented
NC0543 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,738 $6,000 Not Implemented
NC0543 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,805 $100 Implemented
NC0543 # 08 Y:2015 08 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $192 $500 Implemented
NC0543 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $311 $80 Implemented
NC0543 # 10 Y:2015 10 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $8,618 $20,000 Not Implemented
NC0543 # 11 Y:2015 11 2015 DEVELOP A REPAIR/REPLACE POLICY $2,491 $4,256 Not Implemented
NC0543 # 12 Y:2015 12 2015 USE EVAPORATION TO CONCENTRATE MATERIAL $4,794 $19,000 Not Implemented
NC0531 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,220 $200 Implemented
NC0531 # 07 Y:2014 07 2014 DEVELOP A REPAIR/REPLACE POLICY $2,202 $4,256 Implemented
NC0531 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,956 $1,935 Not Implemented
NC0531 # 05 Y:2014 05 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $625 $100 Implemented
NC0531 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $836 $240 Implemented