IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

173

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0531 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,220 $200 Implemented
UD0912 # 11 Y:2014 11 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $47,606 $0 Not Implemented
UD0912 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $724 $1,400 Not Implemented
UD0912 # 10 Y:2014 10 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,833 $5,300 Not Implemented
UD0912 # 04 Y:2014 04 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $35,294 $20,000 Not Implemented
UD0912 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $867 $1,000 Not Implemented
UD0912 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $5,893 $1,130 Not Implemented
UD0912 # 12 Y:2014 12 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $35,785 $199,800 Not Implemented
UD0912 # 09 Y:2014 09 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,329 $10,250 Not Implemented
UD0912 # 07 Y:2014 07 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,602 $0 Not Implemented
UD0912 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,794 $8,675 Not Implemented
UD0912 # 06 Y:2014 06 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,884 $11,400 Not Implemented
UD0912 # 01 Y:2014 01 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $10,884 $0 Not Implemented
NC0522 # 02 Y:2014 02 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,436 $5,000 Not Implemented
NC0522 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,823 $1,500 Implemented
NC0522 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,016 $3,500 Not Implemented
NC0522 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $207 $100 Implemented
NC0522 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $472 $320 Not Implemented
NC0522 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $439 $309 Implemented
NC0522 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $797 $208 Implemented
NC0522 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $455 $400 Not Implemented
NC0522 # 10 Y:2014 10 2014 DEVELOP A REPAIR/REPLACE POLICY $1,616 $4,256 Not Implemented
NC0522 # 11 Y:2014 11 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $971 $3,500 Implemented
NC0522 # 01 Y:2014 01 2014 RECOVER AND REUSE COOLING WATER $3,379 $6,500 Not Implemented
UD0907 # 03 Y:2014 03 2014 COVER OPEN TANKS $2,165 $210 Not Implemented