Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,360
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0292 # 07 Y:2020 | 07 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,874 | $22,200 | Not Implemented |
MZ0292 # 08 Y:2020 | 08 | 2020 | USE PHOTOCELL CONTROLS | $43 | $73 | Implemented |
MZ0292 # 09 Y:2020 | 09 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,588 | $240 | Implemented |
MZ0292 # 10 Y:2020 | 10 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,760 | $45,300 | Not Implemented |
MZ0292 # 11 Y:2020 | 11 | 2020 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $147,061 | $38,160 | Not Implemented |
MZ0292 # 12 Y:2020 | 12 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $99,528 | $502,000 | Implemented |
MZ0292 # 13 Y:2020 | 13 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,837 | $450 | Implemented |
TT0244 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $97,307 | $190,198 | Implemented |
TT0244 # 02 Y:2020 | 02 | 2020 | OPTIMIZE PLANT POWER FACTOR | $16,484 | $39,000 | Not Implemented |
TT0244 # 03 Y:2020 | 03 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,714 | $15,000 | Not Implemented |
TT0244 # 04 Y:2020 | 04 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $4,684 | $200 | Implemented |
TT0244 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,956 | $275 | Not Implemented |
TT0244 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,937 | $40 | Not Implemented |
TT0244 # 07 Y:2020 | 07 | 2020 | INSULATE BARE EQUIPMENT | $131 | $167 | Not Implemented |
UU0170 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,825 | $21,841 | Implemented |
UU0170 # 02 Y:2020 | 02 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,868 | $2,000 | Implemented |
UU0170 # 03 Y:2020 | 03 | 2020 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $1,681 | $1,200 | Not Implemented |
UU0170 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,521 | $150 | Implemented |
UU0170 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $1,259 | $1,259 | Not Implemented |
UU0170 # 06 Y:2020 | 06 | 2020 | INSULATE BARE EQUIPMENT | $676 | $440 | Implemented |
MI0375 # 01 Y:2020 | 01 | 2020 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $9,722 | $20,153 | Implemented |
MI0375 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,712 | $2,100 | Implemented |
MI0375 # 03 Y:2020 | 03 | 2020 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,971 | $965 | Not Implemented |
MI0375 # 04 Y:2020 | 04 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,948 | $2,692 | Not Implemented |
MI0375 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,932 | $4,843 | Implemented |