IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,360

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0292 # 07 Y:2020 07 2020 RECOVER WASTE HEAT FROM EQUIPMENT $18,874 $22,200 Not Implemented
MZ0292 # 08 Y:2020 08 2020 USE PHOTOCELL CONTROLS $43 $73 Implemented
MZ0292 # 09 Y:2020 09 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,588 $240 Implemented
MZ0292 # 10 Y:2020 10 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,760 $45,300 Not Implemented
MZ0292 # 11 Y:2020 11 2020 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $147,061 $38,160 Not Implemented
MZ0292 # 12 Y:2020 12 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $99,528 $502,000 Implemented
MZ0292 # 13 Y:2020 13 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,837 $450 Implemented
TT0244 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $97,307 $190,198 Implemented
TT0244 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $16,484 $39,000 Not Implemented
TT0244 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $5,714 $15,000 Not Implemented
TT0244 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $4,684 $200 Implemented
TT0244 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,956 $275 Not Implemented
TT0244 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,937 $40 Not Implemented
TT0244 # 07 Y:2020 07 2020 INSULATE BARE EQUIPMENT $131 $167 Not Implemented
UU0170 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,825 $21,841 Implemented
UU0170 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $13,868 $2,000 Implemented
UU0170 # 03 Y:2020 03 2020 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $1,681 $1,200 Not Implemented
UU0170 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,521 $150 Implemented
UU0170 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $1,259 $1,259 Not Implemented
UU0170 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $676 $440 Implemented
MI0375 # 01 Y:2020 01 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $9,722 $20,153 Implemented
MI0375 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,712 $2,100 Implemented
MI0375 # 03 Y:2020 03 2020 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,971 $965 Not Implemented
MI0375 # 04 Y:2020 04 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,948 $2,692 Not Implemented
MI0375 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,932 $4,843 Implemented