IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

228

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0244 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,956 $275 Not Implemented
TT0244 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,937 $40 Not Implemented
TT0244 # 07 Y:2020 07 2020 INSULATE BARE EQUIPMENT $131 $167 Not Implemented
TT0236 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,574 $40 Not Implemented
TT0236 # 10 Y:2020 10 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $206 $450 Not Implemented
TT0236 # 09 Y:2020 09 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $984 $1,500 Not Implemented
TT0236 # 08 Y:2020 08 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,653 $2,150 Not Implemented
TT0236 # 07 Y:2020 07 2020 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $1,908 $500 Not Implemented
TT0236 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,447 $15,750 Not Implemented
TT0236 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,754 $2,700 Not Implemented
TT0236 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,250 $128,083 Implemented
TT0236 # 02 Y:2020 02 2020 ADOPT IN-HOUSE MATERIAL GENERATION $28,629 $16,000 Implemented
TT0236 # 01 Y:2020 01 2020 OPTIMIZE PLANT POWER FACTOR $28,173 $90,000 Not Implemented
TT0229 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,229 $9,752 Implemented
TT0229 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $5,315 $24,000 Not Implemented
TT0229 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $8,523 $15,000 Not Implemented
TT0229 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,772 $12,000 Not Implemented
TT0229 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,190 $13,430 Not Implemented
TT0229 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,943 $5,000 Not Implemented
TT0223 # 10 Y:2019 10 2019 RECOVER WASTE HEAT FROM EQUIPMENT $159 $200 Not Implemented
TT0223 # 01 Y:2019 01 2019 RECOVER WASTE HEAT FROM EQUIPMENT $60,944 $189,000 Not Implemented
TT0223 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,339 $172,868 Implemented
TT0223 # 03 Y:2019 03 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $23,500 $2,000 Not Implemented
TT0223 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,403 $80 Not Implemented
TT0223 # 09 Y:2019 09 2019 OPTIMIZE PLANT POWER FACTOR $657 $1,500 Not Implemented