IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,360

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0486 # 03 Y:2019 03 2019 REDUCE VENTILATION AIR $4,494 $890 Not Implemented
SU0486 # 04 Y:2019 04 2019 ELIMINATE/REDUCE AN OPERATION $6,082 $2,288 Not Implemented
SU0486 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,788 $21,904 Not Implemented
SU0486 # 06 Y:2019 06 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $869 $845 Not Implemented
SU0486 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $802 $857 Implemented
SU0486 # 08 Y:2019 08 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $411 $839 Implemented
SU0486 # 09 Y:2019 09 2019 INSTALL OCCUPANCY SENSORS $767 $2,060 Not Implemented
UU0154 # 01 Y:2019 01 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $567,696 $2,355,000 Not Implemented
UU0154 # 02 Y:2019 02 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $262,908 $2,299,950 Not Implemented
UU0154 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170,761 $461,313 Implemented
UU0154 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,288 $2,040 Implemented
UU0154 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $10,215 $3,044 Implemented
UU0154 # 06 Y:2019 06 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,947 $2,000 Not Implemented
UK1908 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,319 $0 Implemented
UK1908 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,190 $3,038 Implemented
UK1908 # 03 Y:2019 03 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $116,074 $438,000 Implemented
UK1908 # 04 Y:2019 04 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $553 $227 Not Implemented
UK1908 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,676 $22,903 Implemented
UK1908 # 06 Y:2019 06 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,551 $0 Implemented
UK1908 # 07 Y:2019 07 2019 DISCONNECT BALLASTS $383 $72 Implemented
UK1908 # 08 Y:2019 08 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $914 $720 Not Implemented
UK1908 # 09 Y:2019 09 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,838 $1,900 Implemented
UK1908 # 10 Y:2019 10 2019 REDUCE FLUID FLOW RATES $2,913 $1,900 Not Implemented
UK1908 # 11 Y:2019 11 2019 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $13,831 $5,000 Not Implemented
UK1908 # 12 Y:2019 12 2019 CLEAN CONDENSER TUBES $15,832 $7,858 Implemented