Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
503
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0520 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,809 | $1,589 | Implemented |
WV0520 # 07 Y:2016 | 07 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $780 | $1,156 | Implemented |
WV0520 # 08 Y:2016 | 08 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $773 | $1,420 | Not Implemented |
WV0520 # 09 Y:2016 | 09 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $461 | $428 | Implemented |
WV0520 # 10 Y:2016 | 10 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $279 | $384 | Implemented |
UD0936 # 01 Y:2015 | 01 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,695 | $0 | Implemented |
UD0936 # 02 Y:2015 | 02 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $22,431 | $2,260 | Implemented |
UD0936 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $17,704 | $6,000 | Not Implemented |
UD0936 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,661 | $825 | Not Implemented |
UD0936 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,521 | $1,000 | Implemented |
UD0936 # 06 Y:2015 | 06 | 2015 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $39,316 | $29,746 | Not Implemented |
UD0936 # 07 Y:2015 | 07 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $530 | $1,480 | Implemented |
UD0936 # 08 Y:2015 | 08 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,271 | $85,000 | Implemented |
UD0936 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $4,331 | $6,300 | Not Implemented |
UD0933 # 01 Y:2015 | 01 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,290 | $0 | Not Implemented |
UD0933 # 02 Y:2015 | 02 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $36,526 | $9,600 | Not Implemented |
UD0933 # 03 Y:2015 | 03 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,840 | $0 | Implemented |
UD0933 # 04 Y:2015 | 04 | 2015 | COVER OPEN TANKS | $1,716 | $200 | Not Implemented |
UD0933 # 05 Y:2015 | 05 | 2015 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,075 | $0 | Implemented |
UD0933 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,155 | $2,950 | Not Implemented |
UD0933 # 07 Y:2015 | 07 | 2015 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $15,649 | $200 | Not Implemented |
UD0933 # 08 Y:2015 | 08 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,264 | $10,000 | Not Implemented |
UD0933 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $52,874 | $48,825 | Not Implemented |
UD0933 # 10 Y:2015 | 10 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,237 | $0 | Not Implemented |
UD0933 # 11 Y:2015 | 11 | 2015 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,138 | $9,000 | Not Implemented |