IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0661 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,376 $4,000 n/a
NC0661 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $6,073 $27,600 n/a
NC0661 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,982 $3,360 n/a
NC0661 # 04 Y:2021 04 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,158 $2,300 n/a
NC0623 # 04 Y:2018 04 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,478 $16,800 Implemented
NC0623 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,322 $900 Implemented
NC0623 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,801 $500 Implemented
NC0623 # 03 Y:2018 03 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $2,320 $1,203 Implemented
NC0623 # 05 Y:2018 05 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $14,884 $10,000 Not Implemented
NC0623 # 06 Y:2018 06 2018 AVOID REWINDING MOTORS MORE THAN TWICE $38,566 $70,014 Not Implemented
NC0612 # 04 Y:2018 04 2018 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $14,909 $500 Implemented
NC0612 # 06 Y:2018 06 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $42,360 $500 Not Implemented
NC0612 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,028 $200 Implemented
NC0612 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $467 $150 Implemented
NC0612 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,235 $215,800 Implemented
NC0612 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,709 $16,988 Implemented
NC0578 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,735 $3,575 Implemented
NC0578 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $633 $50 Implemented
NC0578 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $13,396 $500 Not Implemented
NC0578 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,397 $11,899 Implemented
NC0578 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,551 $26,597 Implemented
NC0578 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $1,016 $3,071 Not Implemented
NC0522 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $472 $320 Not Implemented
NC0522 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $207 $100 Implemented
NC0522 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,016 $3,500 Not Implemented