Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
290
matching recommendationsNAICS | 33631 | Motor Vehicle Gasoline Engine and Engine Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CL2016 # 08 Y:2020 | 08 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,055 | $2,500 | Implemented |
UD1000 # 04 Y:2019 | 04 | 2019 | USE OPTIMUM THICKNESS INSULATION | $2,318 | $290 | Not Implemented |
UD1000 # 03 Y:2019 | 03 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,599 | $0 | Implemented |
UD1000 # 02 Y:2019 | 02 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,606 | $0 | Not Implemented |
UD1000 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $12,280 | $0 | Implemented |
UD1000 # 05 Y:2019 | 05 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,102 | $0 | Not Implemented |
UD1000 # 06 Y:2019 | 06 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $71,143 | $12,480 | Not Implemented |
UD1000 # 07 Y:2019 | 07 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,374 | $48,748 | Not Implemented |
UD1000 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,801 | $81,000 | Implemented |
UD1000 # 09 Y:2019 | 09 | 2019 | INSTALL OCCUPANCY SENSORS | $1,925 | $8,061 | Implemented |
TT0205 # 05 Y:2018 | 05 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $19,941 | $160 | Not Implemented |
TT0205 # 04 Y:2018 | 04 | 2018 | OPTIMIZE PLANT POWER FACTOR | $28,188 | $132,000 | Not Implemented |
TT0205 # 03 Y:2018 | 03 | 2018 | METER WASTE WATER | $30,463 | $1,000 | Not Implemented |
TT0205 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $376,439 | $1,600 | Not Implemented |
TT0205 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $376,439 | $20 | Implemented |
TT0205 # 08 Y:2018 | 08 | 2018 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $5,176 | $6,900 | Not Implemented |
TT0205 # 07 Y:2018 | 07 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $8,761 | $8,362 | Not Implemented |
TT0205 # 06 Y:2018 | 06 | 2018 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $9,911 | $10,800 | Not Implemented |
IP0084 # 09 Y:2017 | 09 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $910 | $416 | Not Implemented |
IP0084 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,043 | $0 | Not Implemented |
IP0084 # 13 Y:2017 | 13 | 2017 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $446 | $1,250 | Implemented |
IP0084 # 10 Y:2017 | 10 | 2017 | APPLY FOR INVESTMENT INCENTIVES | $238 | $125 | Not Implemented |
IP0084 # 11 Y:2017 | 11 | 2017 | INSTALL OCCUPANCY SENSORS | $3,393 | $2,038 | Implemented |
IP0084 # 12 Y:2017 | 12 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $519 | $727 | Not Implemented |
IP0084 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $383 | $4 | Not Implemented |