Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
290
matching recommendationsNAICS | 33631 | Motor Vehicle Gasoline Engine and Engine Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0084 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,534 | $928 | Not Implemented |
IP0084 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $974 | $203 | Implemented |
IP0084 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,221 | $290 | Implemented |
IP0084 # 05 Y:2017 | 05 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,415 | $130 | Implemented |
IP0084 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,458 | $65 | Implemented |
IP0084 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $383 | $4 | Not Implemented |
IP0084 # 02 Y:2017 | 02 | 2017 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $131 | $0 | Implemented |
IP0084 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,043 | $0 | Not Implemented |
LE0418 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,199 | $0 | Implemented |
LE0418 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $60,481 | $15,000 | Not Implemented |
LE0418 # 03 Y:2016 | 03 | 2016 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $317,839 | $125,000 | Implemented |
LE0418 # 04 Y:2016 | 04 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,759 | $6,000 | Implemented |
LE0418 # 05 Y:2016 | 05 | 2016 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $1,116,268 | $1,540,000 | Implemented |
LE0418 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,905 | $12,000 | Implemented |
LE0418 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,745 | $13,000 | Not Implemented |
LE0418 # 08 Y:2016 | 08 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,764 | $11,250 | Not Implemented |
LE0418 # 09 Y:2016 | 09 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $26,015 | $127,400 | Implemented |
NC0531 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $874 | $1,255 | Not Implemented |
NC0531 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $836 | $240 | Implemented |
NC0531 # 02 Y:2014 | 02 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $80,544 | $28,000 | Implemented |
NC0531 # 01 Y:2014 | 01 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,220 | $200 | Implemented |
NC0531 # 05 Y:2014 | 05 | 2014 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $625 | $100 | Implemented |
NC0531 # 06 Y:2014 | 06 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,956 | $1,935 | Not Implemented |
NC0531 # 07 Y:2014 | 07 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $2,202 | $4,256 | Implemented |
NC0522 # 01 Y:2014 | 01 | 2014 | RECOVER AND REUSE COOLING WATER | $3,379 | $6,500 | Not Implemented |