IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

268

matching recommendations
Reset
NAICS 336310 Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0260 # 02 Y:2004 02 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $33,620 $12,000 Implemented
UM0260 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,181 $13,690 Not Implemented
UM0260 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,671 $1,000 Implemented
UM0260 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,831 $2,000 Implemented
UM0260 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,283 $1,050 Implemented
UM0260 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $1,054 $1,564 Not Implemented
SU0174 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,108 $0 Implemented
SU0174 # 02 Y:2004 02 2004 $58,500 $16,260 Implemented
SU0174 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $85 $45 Implemented
SU0174 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,102 $13,384 Implemented
SU0174 # 05 Y:2004 05 2004 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $13,639 $14,240 Implemented
SU0174 # 06 Y:2004 06 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,489 $10,360 Implemented
GT0771 # 01 Y:2003 01 2003 COMBINE UTILITY METERS $3,600 $0 Implemented
GT0771 # 02 Y:2003 02 2003 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $17,568 $23,870 Implemented
GT0771 # 03 Y:2003 03 2003 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $882 $650 Implemented
GT0771 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,260 $1,050 Implemented
GT0771 # 05 Y:2003 05 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $28,826 $1,248 Not Implemented
GT0771 # 06 Y:2003 06 2003 COVER OPEN TANKS $3,255 $3,703 Not Implemented
GT0771 # 07 Y:2003 07 2003 COVER OPEN TANKS $2,447 $3,500 Not Implemented
GT0771 # 08 Y:2003 08 2003 COVER OPEN TANKS $23,765 $700 Not Implemented
GT0771 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $29,561 $12,093 Not Implemented
GT0771 # 10 Y:2003 10 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,823 $0 Not Implemented
UD0682 # 01 Y:2003 01 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $27,674 $15,870 Not Implemented
UD0682 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $27,255 $5,000 Not Implemented
UD0682 # 03 Y:2003 03 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $21,300 $11,000 Not Implemented