IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
Reset
NAICS 33632 Motor Vehicle Electrical and Electronic Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0168 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,425 $4,765 Implemented
UA0168 # 07 Y:2016 07 2016 RECOVER WASTE HEAT FROM EQUIPMENT $13,817 $30,000 Not Implemented
WV0497 # 01 Y:2015 01 2015 UPGRADE CONTROLS ON COMPRESSORS $27,086 $24,525 Not Implemented
WV0497 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,552 $4,210 Not Implemented
WV0497 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $9,773 $3,008 Implemented
WV0497 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,054 $4,016 Implemented
WV0497 # 05 Y:2015 05 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $6,086 $1,000 Implemented
WV0497 # 06 Y:2015 06 2015 DEVELOP A REPAIR/REPLACE POLICY $2,304 $567 Implemented
WV0497 # 07 Y:2015 07 2015 INSTALL SET-BACK TIMERS $2,208 $918 Not Implemented
WV0497 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,824 $404 Not Implemented
WV0497 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $1,207 $186 Not Implemented
WV0497 # 10 Y:2015 10 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $340 $192 Implemented
SU0359 # 01 Y:2014 01 2014 INSULATE FEEDWATER TANK $1,037 $137 Implemented
SU0359 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,651 $1,900 Implemented
SU0359 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $1,346 $470 Implemented
SU0359 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $931 $855 Implemented
SU0359 # 05 Y:2014 05 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $78,976 $119,000 Not Implemented
SU0359 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,476 $4,124 Implemented
IA0508 # 01 Y:2013 01 2013 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $218,077 $1,045,200 Not Implemented
IA0508 # 02 Y:2013 02 2013 REPAIR OR REPLACE STEAM TRAPS $14,349 $3,750 Implemented
IA0508 # 03 Y:2013 03 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,845 $1,000 Implemented
IA0508 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $6,113 $6,000 Implemented
IA0508 # 05 Y:2013 05 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $689 $1,590 Implemented
IA0508 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $6,734 $5,775 Not Implemented
IA0508 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $598 $394 Not Implemented