IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
Reset
NAICS 336320 Motor Vehicle Electrical and Electronic Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0508 # 08 Y:2013 08 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,512 $1,000 Implemented
IA0508 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $3,758 $976 Implemented
IA0508 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,022 $210 Not Implemented
WV0474 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,986 $15,864 Implemented
WV0474 # 02 Y:2013 02 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,866 $21,080 Not Implemented
WV0474 # 03 Y:2013 03 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,698 $1,000 Implemented
WV0474 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,360 $0 Not Implemented
WV0474 # 05 Y:2013 05 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,920 $72 Implemented
WV0474 # 06 Y:2013 06 2013 DEVELOP A REPAIR/REPLACE POLICY $1,715 $392 Implemented
WV0474 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,586 $324 Implemented
WV0474 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $967 $6,150 Not Implemented
WV0474 # 09 Y:2013 09 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $701 $960 Not Implemented
WV0474 # 10 Y:2013 10 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $407 $500 Implemented
SU0289 # 01 Y:2010 01 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,013 $0 Implemented
SU0289 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,573 $0 Implemented
SU0289 # 03 Y:2010 03 2010 $1,552 $0 Implemented
SU0289 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,383 $578 Implemented
SU0289 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,787 $964 Not Implemented
SU0289 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $1,653 $1,236 Implemented
SU0289 # 07 Y:2010 07 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $528 $714 Implemented
SU0289 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,267 $8,373 Not Implemented
TT0036 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,350 $6,490 Not Implemented
TT0036 # 02 Y:2009 02 2009 DISCONNECT BALLASTS $3,640 $0 Implemented
TT0036 # 03 Y:2009 03 2009 INSTALL SPECTRAL REFLECTORS / DELAMP $1,655 $3,220 Not Implemented
TT0036 # 04 Y:2009 04 2009 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $21,675 $30,000 Not Implemented