Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
204
matching recommendationsNAICS | 33634 | Motor Vehicle Brake System Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0223 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,403 | $80 | Not Implemented |
TT0223 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,556 | $7,425 | Not Implemented |
TT0223 # 06 Y:2019 | 06 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,372 | $3,900 | Not Implemented |
TT0223 # 07 Y:2019 | 07 | 2019 | APPLY FOR INVESTMENT INCENTIVES | $4,144 | $40 | Not Implemented |
TT0223 # 08 Y:2019 | 08 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,166 | $1,000 | Not Implemented |
TT0223 # 09 Y:2019 | 09 | 2019 | OPTIMIZE PLANT POWER FACTOR | $657 | $1,500 | Not Implemented |
UD0996 # 12 Y:2019 | 12 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,848 | $80,000 | Implemented |
UD0996 # 11 Y:2019 | 11 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $28,290 | $5,250 | Not Implemented |
UD0996 # 10 Y:2019 | 10 | 2019 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $37,159 | $98,800 | Not Implemented |
UD0996 # 09 Y:2019 | 09 | 2019 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $48,531 | $11,000 | Implemented |
UD0996 # 08 Y:2019 | 08 | 2019 | OPTIMIZE PLANT POWER FACTOR | $127,402 | $60,000 | Implemented |
UD0996 # 07 Y:2019 | 07 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $18,128 | $3,500 | Not Implemented |
UD0996 # 06 Y:2019 | 06 | 2019 | COVER OPEN TANKS | $8,047 | $1,400 | Not Implemented |
UD0996 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $618 | $0 | Implemented |
UD0996 # 04 Y:2019 | 04 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $618 | $0 | Not Implemented |
UD0996 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,446 | $0 | Not Implemented |
UD0996 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,125 | $0 | Not Implemented |
UD0996 # 01 Y:2019 | 01 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,447 | $0 | Implemented |
CL1901 # 02 Y:2019 | 02 | 2019 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,260 | $0 | Implemented |
CL1901 # 03 Y:2019 | 03 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,184 | $0 | Implemented |
CL1901 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,368 | $13,023 | Implemented |
WM0127 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,136 | $2,000 | Not Implemented |
WM0127 # 11 Y:2018 | 11 | 2018 | USE PHOTOCELL CONTROLS | $256 | $47 | Not Implemented |
WM0127 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,300 | $9,602 | Not Implemented |
WM0127 # 02 Y:2018 | 02 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,171 | $48,514 | Not Implemented |