IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

204

matching recommendations
Reset
NAICS 336340 Motor Vehicle Brake System Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0049 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,012 $0 Implemented
MZ0049 # 04 Y:2010 04 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $180 $170 Implemented
MZ0049 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $5,075 $6,650 Implemented
MZ0049 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,075 $3,960 Not Implemented
MZ0049 # 07 Y:2010 07 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $217 $150 Implemented
MZ0049 # 08 Y:2010 08 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,410 $2,800 Implemented
MZ0049 # 09 Y:2010 09 2010 COMBINE UTILITY METERS $288 $0 Not Implemented
MZ0049 # 10 Y:2010 10 2010 REDUCE SCRAP PRODUCTION $3,156 $0 Implemented
MZ0049 # 11 Y:2010 11 2010 USE OPTIMUM TEMPERATURE $1,228 $0 Not Implemented
MZ0049 # 12 Y:2010 12 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,900 $37,600 Implemented
GT0868 # 01 Y:2009 01 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,075 $19,000 Not Implemented
GT0868 # 02 Y:2009 02 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,414 $3,000 Not Implemented
GT0868 # 03 Y:2009 03 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,079 $12,000 Not Implemented
GT0868 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,232 $60,000 Implemented
GT0868 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,204 $4,676 Implemented
GT0868 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,368 $4,750 Implemented
UM0348 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $56,000 $6,000 Implemented
UM0348 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $51,000 $3,000 Implemented
UM0348 # 03 Y:2009 03 2009 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $30,000 $62,000 Not Implemented
UM0348 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $22,700 $12,400 Not Implemented
UM0348 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,200 $35,689 Implemented
UM0348 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,900 $200 Implemented
UM0348 # 07 Y:2009 07 2009 USE RADIANT HEATER FOR SPOT HEATING $6,200 $15,000 Implemented
UM0348 # 08 Y:2009 08 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,300 $3,900 Not Implemented
UM0348 # 09 Y:2009 09 2009 INSTALL OCCUPANCY SENSORS $3,400 $7,400 Not Implemented