IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

155

matching recommendations
Reset
NAICS 33635 Motor Vehicle Transmission and Power Train Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0487 # 09 Y:2014 09 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,002 $3,401 Implemented
WV0487 # 10 Y:2014 10 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,857 $570 Implemented
WV0487 # 11 Y:2014 11 2014 INSTALL TIMERS AND/OR THERMOSTATS $1,698 $1,760 Implemented
WV0487 # 12 Y:2014 12 2014 DEVELOP A REPAIR/REPLACE POLICY $1,457 $1,334 Implemented
WV0487 # 13 Y:2014 13 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,419 $70 Implemented
WV0487 # 16 Y:2014 16 2014 INSULATE BARE EQUIPMENT $564 $2,006 Implemented
WV0487 # 17 Y:2014 17 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $534 $792 Implemented
OK0861 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,427 $1,250 Implemented
SU0339 # 01 Y:2013 01 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $4,610 $0 Implemented
SU0339 # 03 Y:2013 03 2013 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,064 $125 Implemented
SU0339 # 04 Y:2013 04 2013 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $18,079 $3,600 Implemented
SU0339 # 05 Y:2013 05 2013 ADD AREA LIGHTING SWITCHES $429 $152 Implemented
SU0339 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $2,294 $2,093 Implemented
SU0339 # 09 Y:2013 09 2013 ELIMINATE/REDUCE AN OPERATION $13,535 $19,680 Implemented
UM0410 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,779 $100 Implemented
SU0319 # 04 Y:2012 04 2012 ELIMINATE/REDUCE AN OPERATION $24,117 $15,840 Implemented
SU0319 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,410 $2,500 Implemented
SU0319 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,147 $1,075 Implemented
SU0319 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $250,480 $603,880 Implemented
IC0189 # 01 Y:2011 01 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,166 $0 Implemented
IC0189 # 02 Y:2011 02 2011 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $156,506 $686,583 Implemented
IC0189 # 03 Y:2011 03 2011 UPGRADE OBSOLETE EQUIPMENT $12,266 $100,000 Implemented
IC0189 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,263 $1,142 Implemented
IC0189 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $4,441 $382 Implemented
IC0189 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43 $58 Implemented