IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

361

matching recommendations
Reset
NAICS 33635 Motor Vehicle Transmission and Power Train Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0189 # 02 Y:2011 02 2011 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $156,506 $686,583 Implemented
IC0189 # 03 Y:2011 03 2011 UPGRADE OBSOLETE EQUIPMENT $12,266 $100,000 Implemented
IC0189 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,263 $1,142 Implemented
IC0189 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $4,441 $382 Implemented
IC0189 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43 $58 Implemented
IC0189 # 07 Y:2011 07 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $294 $0 Not Implemented
NC0429 # 01 Y:2011 01 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $27,312 $0 Not Implemented
NC0429 # 02 Y:2011 02 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $21,573 $45,000 Not Implemented
NC0429 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,733 $100 Implemented
NC0429 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,499 $5,803 Not Implemented
NC0429 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $830 $2,077 Not Implemented
UD0776 # 01 Y:2008 01 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $65,320 $0 Not Implemented
UD0776 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,929 $1,000 Implemented
UD0776 # 03 Y:2008 03 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $47,472 $6,525 Not Implemented
UD0776 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,691 $0 Not Implemented
UD0776 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,304 $20,000 Not Implemented
UD0776 # 06 Y:2008 06 2008 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $30,220 $0 Implemented
UD0776 # 07 Y:2008 07 2008 REDUCE VENTILATION AIR $26,630 $160,000 Not Implemented
UD0776 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,000 $0 Not Implemented
UD0776 # 09 Y:2008 09 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,675 $45,000 Not Implemented
UD0776 # 10 Y:2008 10 2008 Hardware $8,341 $29,290 Not Implemented
UD0776 # 11 Y:2008 11 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,999 $7,312 Not Implemented
UD0776 # 12 Y:2008 12 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,278 $0 Not Implemented
UD0769 # 01 Y:2007 01 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $126,798 $0 Implemented
UD0769 # 02 Y:2007 02 2007 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $119,000 $0 Implemented