IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
Reset
NAICS 336350 Motor Vehicle Transmission and Power Train Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0061 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,196 $35 Implemented
IP0061 # 04 Y:2016 04 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $931 $20 Implemented
IP0061 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $5,310 $1,611 Implemented
IP0061 # 06 Y:2016 06 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,664 $3,260 Implemented
IP0061 # 08 Y:2016 08 2016 RECYCLE WHITE WATER $61,804 $36,000 Implemented
IP0061 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,505 $75,569 Implemented
IP0034 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,454 $0 Implemented
IP0034 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,112 $0 Implemented
WV0487 # 04 Y:2014 04 2014 UPGRADE CONTROLS ON COMPRESSORS $10,990 $7,560 Implemented
WV0487 # 05 Y:2014 05 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $9,081 $1,000 Implemented
WV0487 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $5,633 $2,520 Implemented
WV0487 # 07 Y:2014 07 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,533 $0 Implemented
WV0487 # 09 Y:2014 09 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,002 $3,401 Implemented
WV0487 # 10 Y:2014 10 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,857 $570 Implemented
WV0487 # 11 Y:2014 11 2014 INSTALL TIMERS AND/OR THERMOSTATS $1,698 $1,760 Implemented
WV0487 # 12 Y:2014 12 2014 DEVELOP A REPAIR/REPLACE POLICY $1,457 $1,334 Implemented
WV0487 # 13 Y:2014 13 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,419 $70 Implemented
WV0487 # 16 Y:2014 16 2014 INSULATE BARE EQUIPMENT $564 $2,006 Implemented
WV0487 # 17 Y:2014 17 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $534 $792 Implemented
OK0861 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,427 $1,250 Implemented
SU0339 # 01 Y:2013 01 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $4,610 $0 Implemented
SU0339 # 03 Y:2013 03 2013 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,064 $125 Implemented
SU0339 # 04 Y:2013 04 2013 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $18,079 $3,600 Implemented
SU0339 # 05 Y:2013 05 2013 ADD AREA LIGHTING SWITCHES $429 $152 Implemented
SU0339 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $2,294 $2,093 Implemented