Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
507
matching recommendationsNAICS | 33637 | Motor Vehicle Metal Stamping |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1049 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $115,254 | $300,000 | Implemented |
UD1049 # 07 Y:2023 | 07 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $27,897 | $0 | Implemented |
IP0163 # 01 Y:2022 | 01 | 2022 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $241 | $0 | Implemented |
IP0163 # 02 Y:2022 | 02 | 2022 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $24,564 | $0 | Not Implemented |
IP0163 # 03 Y:2022 | 03 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,306 | $3 | Implemented |
IP0163 # 04 Y:2022 | 04 | 2022 | USE PHOTOCELL CONTROLS | $2,682 | $248 | Implemented |
IP0163 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $712 | $72 | Implemented |
IP0163 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,466 | $3,681 | Implemented |
IP0163 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,570 | $851 | Implemented |
IP0163 # 08 Y:2022 | 08 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,345 | $2,259 | Implemented |
IP0163 # 09 Y:2022 | 09 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $640 | $674 | Implemented |
IP0163 # 10 Y:2022 | 10 | 2022 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $4,458 | $8,975 | Not Implemented |
MU0002 # 08 Y:2022 | 08 | 2022 | USE RADIANT HEATER FOR SPOT HEATING | $1,961 | $3,045 | Implemented |
MU0002 # 07 Y:2022 | 07 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $17,145 | $16,000 | Implemented |
MU0002 # 06 Y:2022 | 06 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $47,027 | $242,692 | Implemented |
MU0002 # 05 Y:2022 | 05 | 2022 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $701 | $0 | Implemented |
MU0002 # 04 Y:2022 | 04 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,592 | $0 | Not Implemented |
MU0002 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $610 | $1,113 | Implemented |
MU0002 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,292 | $1,250 | Implemented |
MU0002 # 01 Y:2022 | 01 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,933 | $0 | Implemented |
UA0243 # 05 Y:2021 | 05 | 2021 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $2,529 | $100 | Not Implemented |
UA0243 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,058 | $9,682 | Implemented |
UA0243 # 03 Y:2021 | 03 | 2021 | OPTIMIZE PLANT POWER FACTOR | $45,219 | $10,941 | Implemented |
UA0243 # 02 Y:2021 | 02 | 2021 | USE PHOTOCELL CONTROLS | $8,709 | $24,348 | Not Implemented |
UA0243 # 01 Y:2021 | 01 | 2021 | INSTALL OCCUPANCY SENSORS | $6,816 | $22,649 | Not Implemented |