IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
NAICS 336390 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0020 # 02 Y:2022 02 2022 USE OPTIMUM TEMPERATURE $226,577 $176,800 Implemented
MU0020 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,404 $5,949 Implemented
MU0020 # 10 Y:2022 10 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $210,000 $0 Implemented
MU0010 # 01 Y:2022 01 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,187 $13,999 Implemented
MU0010 # 02 Y:2022 02 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,866 $16,000 Implemented
MU0010 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $842 $2,452 Implemented
MU0010 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $655 $619 Implemented
CW0111 # 02 Y:2020 02 2020 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,231 $200 Implemented
CW0111 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $1,147 $3,000 Implemented
CW0111 # 06 Y:2020 06 2020 USE DEIONIZED WATER IN UPSTREAM RINSE TANKS $39,911 $4,800 Implemented
CW0111 # 07 Y:2020 07 2020 AVOID FROST FORMATION ON EVAPORATORS $27,066 $28,000 Implemented
CW0111 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $577 $50 Implemented
UM0463 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150,724 $565,274 Implemented
UM0436 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,924 $2,500 Implemented
UM0345 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,336 $460 Implemented
UM0345 # 03 Y:2008 03 2008 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,558 $0 Implemented
UM0345 # 02 Y:2008 02 2008 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $8,397 $1,650 Implemented
UM0337 # 06 Y:2008 06 2008 INSULATE BARE EQUIPMENT $791 $478 Implemented
UM0337 # 02 Y:2008 02 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,515 $240 Implemented
UM0335 # 07 Y:2008 07 2008 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,972 $50 Implemented
UM0335 # 06 Y:2008 06 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,331 $15,000 Implemented
UM0335 # 05 Y:2008 05 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,221 $500 Implemented
UM0316 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $686 $350 Implemented
UM0316 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $1,059 $833 Implemented
UM0314 # 03 Y:2006 03 2006 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $12,963 $2,480 Implemented