IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 336390 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0742 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,300 $0 Implemented
AM0742 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,650 $600 Implemented
AM0742 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $880 $5 Implemented
AM0726 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $13,440 $1,904 Implemented
AM0726 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,305 $6,120 Implemented
AM0726 # 02 Y:2017 02 2017 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $13,960 $1,200 Implemented
TA0079 # 04 Y:2004 04 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,490 $200 Implemented
TA0079 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,280 $720 Implemented
TA0079 # 05 Y:2004 05 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,450 $720 Implemented
TA0079 # 07 Y:2004 07 2004 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $280 $0 Implemented
TA0048 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,000 $24,409 Implemented
TA0048 # 02 Y:2003 02 2003 INSTALL SYSTEM TO COLLECT SCRAP $6,700 $82 Implemented
TA0048 # 03 Y:2003 03 2003 REPAIR AND ELIMINATE STEAM LEAKS $6,390 $1,045 Implemented
TA0048 # 04 Y:2003 04 2003 AIR CONDITION ONLY SPACE NECESSARY $6,360 $0 Implemented
TA0048 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $130 Implemented
TA0048 # 06 Y:2003 06 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,083 $0 Implemented
TA0048 # 09 Y:2003 09 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $690 $170 Implemented
TA0048 # 12 Y:2003 12 2003 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $200 $129 Implemented
TA0046 # 06 Y:2003 06 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,510 $430 Implemented
TA0046 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $3,810 $605 Implemented
TA0046 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $2,310 $0 Implemented
TA0046 # 10 Y:2003 10 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,270 $0 Implemented
TA0046 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,290 $1,200 Implemented
TA0046 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,890 $620 Implemented
TA0046 # 03 Y:2003 03 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,288 $0 Implemented