IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,252

matching recommendations
Reset
NAICS 336390 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0687 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $165 $15 Implemented
IA0328 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $107 $145 Implemented
IA0328 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,948 $254 Implemented
IA0328 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $327 $71 Implemented
IA0328 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,591 $17,302 Implemented
IA0328 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $636 $827 Implemented
IA0328 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $120 $333 Not Implemented
IA0328 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $446 $1,365 Not Implemented
IA0328 # 08 Y:2003 08 2003 INSULATE BARE EQUIPMENT $572 $1,552 Not Implemented
IA0328 # 09 Y:2003 09 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,701 $23,701 Implemented
UM0239 # 01 Y:2003 01 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $247,018 $270,000 Implemented
UM0239 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $82,330 $148,050 Implemented
UM0239 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $80,476 $15,000 Not Implemented
UM0239 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $35,180 $1,100 Implemented
UM0239 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $18,295 $24,675 Not Implemented
UM0239 # 06 Y:2003 06 2003 COVER OPEN TANKS $7,400 $3,290 Not Implemented
UM0239 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,815 $300 Implemented
GT0760 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $16,900 $6,000 Implemented
GT0760 # 02 Y:2003 02 2003 COMBINE UTILITY METERS $2,594 $0 Not Implemented
GT0760 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,540 $141,627 Implemented
GT0760 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,867 $45,247 Implemented
GT0760 # 05 Y:2003 05 2003 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $10,670 $9,380 Implemented
GT0760 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,450 $900 Not Implemented
GT0760 # 07 Y:2003 07 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $4,092 $1,540 Implemented
GT0760 # 08 Y:2003 08 2003 CONTROL PRESSURE ON STEAMER OPERATIONS $13,500 $13,200 Not Implemented