IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,719

matching recommendations
Reset
NAICS 3364 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0832 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $995 $6,375 Not Implemented
OK0832 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $655 $4,180 Not Implemented
OK0832 # 05 Y:2012 05 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,428 $7,200 Not Implemented
OK0832 # 06 Y:2012 06 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,382 $34,962 Not Implemented
OK0832 # 07 Y:2012 07 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $6,074 $29,738 Not Implemented
OK0832 # 08 Y:2012 08 2012 INSTALL SET-BACK TIMERS $2,158 $185 Not Implemented
OK0832 # 09 Y:2012 09 2012 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,579 $1,170 Implemented
OK0832 # 10 Y:2012 10 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,669 $696 Not Implemented
OK0832 # 11 Y:2012 11 2012 OPTIMIZE PLANT POWER FACTOR $1,632 $8,864 Not Implemented
MAS026 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,352 $59,500 Not Implemented
MAS026 # 02 Y:2012 02 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $15,819 $17,200 Not Implemented
MAS026 # 03 Y:2012 03 2012 REDUCE VENTILATION AIR $14,331 $8,000 Not Implemented
MAS026 # 04 Y:2012 04 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,915 $5,000 Not Implemented
MAS026 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,426 $0 Not Implemented
MA0695 # 01 Y:2012 01 2012 BURN A LESS EXPENSIVE GRADE OF FUEL $24,095 $20,000 Not Implemented
MA0695 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $22,626 $5,600 Implemented
MA0695 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $8,891 $200 Implemented
MA0695 # 04 Y:2012 04 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $6,220 $11,500 Implemented
MA0695 # 05 Y:2012 05 2012 OPTIMIZE PLANT POWER FACTOR $5,965 $10,975 Implemented
MA0695 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,830 $1,000 Not Implemented
MA0695 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,676 $1,000 Implemented
MA0695 # 08 Y:2012 08 2012 REDUCE VENTILATION AIR $2,481 $5,375 Not Implemented
MA0695 # 09 Y:2012 09 2012 INSTALL OCCUPANCY SENSORS $2,470 $7,725 Not Implemented
MA0695 # 10 Y:2012 10 2012 INSULATE BARE EQUIPMENT $2,281 $2,630 Not Implemented
MA0695 # 11 Y:2012 11 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,309 $1,260 Implemented