IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,719

matching recommendations
Reset
NAICS 3364 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0354 # 03 Y:2007 03 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $65,972 $100,000 Not Implemented
NC0354 # 04 Y:2007 04 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $35,076 $2,000 Not Implemented
NC0354 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,375 $100 Implemented
NC0354 # 06 Y:2007 06 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $7,411 $2,000 Implemented
NC0354 # 07 Y:2007 07 2007 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,714 $1,000 Not Implemented
NC0354 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,936 $2,559 Implemented
BD0319 # 01 Y:2007 01 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $21,538 $875 Implemented
BD0319 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $403 $475 Not Implemented
BD0319 # 03 Y:2007 03 2007 USE PHOTOCELL CONTROLS $328 $250 Not Implemented
BD0319 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,763 $0 Implemented
BD0319 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $876 $500 Not Implemented
BD0319 # 06 Y:2007 06 2007 MINIMIZE WATER USAGE $1,153 $2,800 Not Implemented
TA0131 # 01 Y:2006 01 2006 UPGRADE CONTROLS ON COMPRESSORS $18,180 $16 Implemented
TA0131 # 02 Y:2006 02 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,225 $60 Not Implemented
TA0131 # 03 Y:2006 03 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,180 $630 Not Implemented
TA0131 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,450 $120 Implemented
TA0131 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,400 $0 Implemented
OR0512 # 01 Y:2006 01 2006 INSTALL OCCUPANCY SENSORS $100,600 $5,500 Implemented
OR0512 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $32,700 $20,600 Not Implemented
OR0512 # 03 Y:2006 03 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,000 $5,000 Implemented
OR0512 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $6,300 $5,000 Implemented
OR0512 # 05 Y:2006 05 2006 UPGRADE CONTROLS ON COMPRESSORS $4,400 $7,500 Implemented
UU0112 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $0 $0 Not Implemented
UU0112 # 02 Y:2006 02 2006 REPAIR OR REPLACE STEAM TRAPS $121,540 $8,720 Not Implemented
UU0112 # 03 Y:2006 03 2006 CLOSE OFF UNNEEDED STEAM LINES $140,530 $250,000 Not Implemented