Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
92
matching recommendationsNAICS | 3364 | Aerospace Product and Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0120 # 05 Y:2021 | 05 | 2021 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,965 | $510 | Implemented |
CW0120 # 04 Y:2021 | 04 | 2021 | MODIFY STARTUP/SHUTDOWN TIMES | $2,380 | $100,000 | Implemented |
CW0120 # 02 Y:2021 | 02 | 2021 | INSTALL BACK-UP EQUIPMENT | $32,054 | $93,000 | Implemented |
CW0120 # 01 Y:2021 | 01 | 2021 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $30,000 | $70,084 | Implemented |
CW0120 # 08 Y:2021 | 08 | 2021 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $217 | $86 | Implemented |
CW0120 # 06 Y:2021 | 06 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $899 | $0 | Implemented |
CW0120 # 07 Y:2021 | 07 | 2021 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,000,000 | $122,000 | Implemented |
CW0120 # 03 Y:2021 | 03 | 2021 | USE BATTERY STORAGE FOR DEMAND CONTROL | $18,089 | $25,885 | Implemented |
IP0152 # 05 Y:2021 | 05 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $268 | $867 | Not Implemented |
IP0152 # 04 Y:2021 | 04 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,039 | $1,254 | Not Implemented |
IP0152 # 03 Y:2021 | 03 | 2021 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $22,427 | $10,500 | Not Implemented |
IP0152 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $80 | $97 | Not Implemented |
IP0152 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $236 | $35 | Not Implemented |
MI0394 # 08 Y:2021 | 08 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,367 | $2,549 | Implemented |
MI0394 # 07 Y:2021 | 07 | 2021 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,040 | $616 | Not Implemented |
MI0394 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,427 | $1,980 | Implemented |
MI0394 # 05 Y:2021 | 05 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,836 | $2,100 | Not Implemented |
MI0394 # 04 Y:2021 | 04 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,060 | $14,609 | Not Implemented |
MI0394 # 02 Y:2021 | 02 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,537 | $1,380 | Not Implemented |
MI0394 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $24,463 | $480 | Implemented |
MI0394 # 03 Y:2021 | 03 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,170 | $2,549 | Not Implemented |
AM0830 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,150 | $0 | Implemented |
AM0830 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $4,020 | $16,040 | Not Implemented |
AM0830 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,300 | $25 | Implemented |
AM0830 # 04 Y:2021 | 04 | 2021 | USE PHOTOCELL CONTROLS | $2,760 | $460 | Implemented |