IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

723

matching recommendations
Reset
NAICS 33641 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0915 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,176 $103,015 Implemented
OK0915 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,867 $20,538 Implemented
OK0915 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,060 $24,180 Implemented
OK0915 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,077 $6,900 Implemented
OK0915 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $674 $382 Implemented
OK0915 # 11 Y:2015 11 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,720 $3,060 Implemented
MI0278 # 03 Y:2015 03 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $45,923 $79,106 Implemented
MI0278 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,431 $9,248 Implemented
MI0278 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,235 $1,660 Implemented
MI0278 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $4,706 $2,901 Implemented
MI0278 # 07 Y:2015 07 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,804 $480 Implemented
MI0278 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,391 $8,360 Implemented
MI0278 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,181 $40 Implemented
MI0278 # 10 Y:2015 10 2015 USE OPTIMUM THICKNESS INSULATION $711 $610 Implemented
MI0278 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $671 $1,880 Implemented
MA0744 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $8,840 $12,155 Implemented
MA0744 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,325 $1,800 Implemented
MA0740 # 01 Y:2015 01 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $18,853 $200 Implemented
MA0740 # 02 Y:2015 02 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $5,057 $4,200 Implemented
MA0740 # 03 Y:2015 03 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,672 $11,200 Implemented
MA0740 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,745 $6,695 Implemented
MA0740 # 05 Y:2015 05 2015 REDUCE VENTILATION AIR $3,084 $2,450 Implemented
MA0740 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,904 $1,425 Implemented
MA0740 # 08 Y:2015 08 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,775 $2,010 Implemented
MA0740 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $426 $500 Implemented