Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
NAICS 33641 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0020 # 06 Y:2024 06 2024 APPLY FOR INVESTMENT INCENTIVES $52,462 $0 Implemented
NT0020 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,251 $0 Implemented
NT0020 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,491 $4,553 Implemented
TR0043 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $33,031 $5,000 Implemented
NT0001 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,707 $6,472 Implemented
NT0001 # 06 Y:2023 06 2023 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $2,710 $0 Implemented
NT0001 # 02 Y:2023 02 2023 UPGRADE CONTROLS ON COMPRESSORS $16,452 $9,984 Implemented
NT0001 # 05 Y:2023 05 2023 INSTALL SET-BACK TIMERS $883 $0 Implemented
NT0001 # 03 Y:2023 03 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,130 $1,258 Implemented
NT0001 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,144 $5,801 Implemented
AM0830 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $11,150 $0 Implemented
AM0830 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,740 $1,170 Implemented
AM0830 # 04 Y:2021 04 2021 USE PHOTOCELL CONTROLS $2,760 $460 Implemented
AM0830 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,300 $25 Implemented
OK1054 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,347 $2,505 Implemented
OK1054 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $624 $2,620 Implemented
OK1053 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,462 $16,440 Implemented
OK1053 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $3,190 Implemented
OK1053 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,155 $26,670 Implemented
OK1053 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,980 $0 Implemented
TR0005 # 10 Y:2017 10 2017 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $8,320 $966 Implemented
TR0005 # 01 Y:2017 01 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,452 $6,500 Implemented
TR0005 # 03 Y:2017 03 2017 CHANGE METHOD OF DEIONIZED WATER PRODUCTION $258,000 $292,000 Implemented
TR0005 # 04 Y:2017 04 2017 METER WASTE WATER $11,708 $2,650 Implemented
TR0005 # 05 Y:2017 05 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $15,338 $56,000 Implemented