IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

379

matching recommendations
Reset
NAICS 336412 Aircraft Engine and Engine Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0354 # 04 Y:2007 04 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $35,076 $2,000 Not Implemented
NC0354 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,375 $100 Implemented
NC0354 # 06 Y:2007 06 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $7,411 $2,000 Implemented
NC0354 # 07 Y:2007 07 2007 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,714 $1,000 Not Implemented
NC0354 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,936 $2,559 Implemented
TA0131 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,450 $120 Implemented
TA0131 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,400 $0 Implemented
TA0131 # 03 Y:2006 03 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,180 $630 Not Implemented
TA0131 # 02 Y:2006 02 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,225 $60 Not Implemented
TA0131 # 01 Y:2006 01 2006 UPGRADE CONTROLS ON COMPRESSORS $18,180 $16 Implemented
MA0607 # 01 Y:2006 01 2006 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $46,963 $0 Not Implemented
MA0607 # 02 Y:2006 02 2006 REDUCE VENTILATION AIR $45,943 $10,400 Not Implemented
MA0607 # 03 Y:2006 03 2006 BURN A LESS EXPENSIVE GRADE OF FUEL $14,261 $5,500 Not Implemented
MA0607 # 04 Y:2006 04 2006 REDUCE VENTILATION AIR $12,889 $1,700 Not Implemented
MA0607 # 05 Y:2006 05 2006 USE UTILITY CONTROLLED POWER MANAGEMENT $12,223 $14,000 Not Implemented
MA0607 # 06 Y:2006 06 2006 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $10,577 $1,870 Not Implemented
MA0607 # 07 Y:2006 07 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,860 $3,500 Not Implemented
AS0412 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $37,489 $5,000 Implemented
AS0412 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $37,178 $15,000 Implemented
AS0412 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,601 $2,000 Implemented
AS0412 # 04 Y:2005 04 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,470 $14,400 Implemented
AS0412 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,173 $10,610 Implemented
AS0412 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $762 $25 Implemented
AS0412 # 07 Y:2005 07 2005 USE SOLAR HEAT TO HEAT WATER $345 $2,800 Implemented
GT0806 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $22,100 $2,782 Not Implemented