Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
379
matching recommendationsNAICS | 336412 | Aircraft Engine and Engine Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0781 # 03 Y:2017 | 03 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,896 | $61,500 | Not Implemented |
MA0781 # 04 Y:2017 | 04 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,734 | $2,724 | Implemented |
MA0781 # 05 Y:2017 | 05 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $285 | $215 | Implemented |
MA0779 # 01 Y:2017 | 01 | 2017 | USE SOLAR HEAT FOR HEAT | $71,879 | $609,753 | Not Implemented |
MA0779 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,670 | $8,325 | Not Implemented |
MA0779 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,745 | $19,917 | Not Implemented |
MA0779 # 04 Y:2017 | 04 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,249 | $100 | Implemented |
MA0779 # 05 Y:2017 | 05 | 2017 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,890 | $7,225 | Not Implemented |
MA0779 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $213 | $200 | Implemented |
MA0767 # 01 Y:2016 | 01 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $30,841 | $74,750 | Not Implemented |
MA0767 # 02 Y:2016 | 02 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,408 | $15,090 | Not Implemented |
MA0767 # 03 Y:2016 | 03 | 2016 | REDUCE VENTILATION AIR | $7,620 | $3,955 | Implemented |
MA0767 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $911 | $3,330 | Implemented |
MA0767 # 05 Y:2016 | 05 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $461 | $157 | Implemented |
MA0767 # 06 Y:2016 | 06 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $361 | $274 | Implemented |
MZ0188 # 01 Y:2015 | 01 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $19,385 | $0 | Implemented |
MZ0188 # 02 Y:2015 | 02 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,967 | $10,000 | Not Implemented |
MZ0188 # 03 Y:2015 | 03 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,249 | $1,000 | Implemented |
MZ0188 # 04 Y:2015 | 04 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,811 | $0 | Implemented |
MA0744 # 01 Y:2015 | 01 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,197 | $27,500 | Not Implemented |
MA0744 # 02 Y:2015 | 02 | 2015 | OPTIMIZE PLANT POWER FACTOR | $8,840 | $12,155 | Implemented |
MA0744 # 03 Y:2015 | 03 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,413 | $39,000 | Not Implemented |
MA0744 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,325 | $1,800 | Implemented |
MA0744 # 05 Y:2015 | 05 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,753 | $3,460 | Not Implemented |
MA0744 # 06 Y:2015 | 06 | 2015 | REDUCE VENTILATION AIR | $2,077 | $500 | Not Implemented |