IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,028

matching recommendations
Reset
NAICS 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0154 # 03 Y:2007 03 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $30,511 $120 Implemented
MI0154 # 04 Y:2007 04 2007 DISCONNECT BALLASTS $27,192 $1,450 Not Implemented
MI0154 # 05 Y:2007 05 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,388 $1,250 Not Implemented
MI0154 # 06 Y:2007 06 2007 PAY BILLS ON TIME TO AVOID LATE FEES $3,146 $300 Implemented
MI0154 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,092 $1,074 Implemented
MI0154 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,043 $30 Implemented
OK0741 # 01 Y:2007 01 2007 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $144,120 $500,000 Not Implemented
OK0741 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,666 $860 Not Implemented
OK0741 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $8,334 $7,480 Not Implemented
OK0741 # 04 Y:2007 04 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,042 $6,800 Not Implemented
OK0741 # 05 Y:2007 05 2007 INSTALL SET-BACK TIMERS $273 $248 Not Implemented
OR0512 # 01 Y:2006 01 2006 INSTALL OCCUPANCY SENSORS $100,600 $5,500 Implemented
OR0512 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $32,700 $20,600 Not Implemented
OR0512 # 03 Y:2006 03 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,000 $5,000 Implemented
OR0512 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $6,300 $5,000 Implemented
OR0512 # 05 Y:2006 05 2006 UPGRADE CONTROLS ON COMPRESSORS $4,400 $7,500 Implemented
UU0106 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $19,900 $40,020 Not Implemented
UU0106 # 02 Y:2006 02 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $43,630 $20,000 Not Implemented
UU0106 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,510 $3,780 Not Implemented
UU0106 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,120 $4,000 Not Implemented
UU0106 # 05 Y:2006 05 2006 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $23,010 $7,390 Not Implemented
UU0106 # 06 Y:2006 06 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $590 $500 Not Implemented
MS0301 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $17,310 $21,720 Implemented
MS0301 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,625 $30,484 Implemented
MS0301 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,037 $21,914 Implemented