IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

793

matching recommendations
Reset
NAICS 337 Furniture and Related Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0665 # 07 Y:2024 07 2024 INSULATE BARE EQUIPMENT $3,763 $2,971 Implemented
WV0665 # 08 Y:2024 08 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,306 $1,070 Implemented
WV0665 # 05 Y:2024 05 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $6,272 $1,500 Implemented
WV0665 # 12 Y:2024 12 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,582 $375 Implemented
WV0665 # 06 Y:2024 06 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,064 $3,296 Implemented
WV0665 # 09 Y:2024 09 2024 DEVELOP A REPAIR/REPLACE POLICY $2,096 $1,417 Implemented
WV0665 # 10 Y:2024 10 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,835 $150 Implemented
LE0568 # 03 Y:2024 03 2024 INSTALL TIMERS AND/OR THERMOSTATS $6,769 $1,120 Implemented
LE0568 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $1,730 $1,215 Implemented
LE0568 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,890 $200 Implemented
LE0568 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,155 $1,400 Implemented
LE0568 # 01 Y:2024 01 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,304 $0 Implemented
LE0568 # 08 Y:2024 08 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,570 $9,661 Implemented
LE0568 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,295 $12,500 Implemented
WV0644 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $954 $1,965 Implemented
WV0644 # 11 Y:2023 11 2023 INSULATE BARE EQUIPMENT $21 $31 Implemented
WV0644 # 10 Y:2023 10 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $76 $368 Implemented
WV0644 # 03 Y:2023 03 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,500 $1,023 Implemented
WV0644 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $530 $100 Implemented
WV0644 # 07 Y:2023 07 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $523 $1,573 Implemented
WV0644 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $459 $1,293 Implemented
WV0644 # 09 Y:2023 09 2023 DEVELOP A REPAIR/REPLACE POLICY $310 $592 Implemented
LE0547 # 01 Y:2023 01 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $846 $400 Implemented
LE0547 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $602 $1,720 Implemented
LE0547 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,448 $13,930 Implemented