IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

229

matching recommendations
Reset
NAICS 33712 Household and Institutional Furniture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0311 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,798 $14,107 Implemented
NC0311 # 02 Y:2005 02 2005 REPROCESS SPENT OILS ON SITE FOR RE-USE $15,075 $4,000 Not Implemented
NC0311 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,158 $100 Implemented
NC0311 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,954 $750 Implemented
NC0311 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $4,051 $7,280 Not Implemented
NC0311 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,142 $3,555 Implemented
NC0311 # 07 Y:2005 07 2005 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $242,500 $150,000 Not Implemented
NC0311 # 08 Y:2005 08 2005 INSTALL SYSTEM TO COLLECT SCRAP $6,250 $10,000 Implemented
NC0310 # 01 Y:2005 01 2005 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $167,500 $150,000 Implemented
NC0310 # 02 Y:2005 02 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $97,500 $61,250 Implemented
NC0310 # 03 Y:2005 03 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $60,000 $20,500 Implemented
NC0310 # 04 Y:2005 04 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $34,863 $30,000 Not Implemented
NC0310 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,451 $3,000 Implemented
NC0310 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $1,830 $875 Implemented
NC0310 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $339 $616 Not Implemented
NC0310 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $509 $100 Implemented
NC0307 # 01 Y:2004 01 2004 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $151,225 $150,000 Not Implemented
NC0307 # 02 Y:2004 02 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $72,400 $49,500 Implemented
NC0307 # 03 Y:2004 03 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $32,361 $24,000 Not Implemented
NC0307 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $16,989 $31,278 Not Implemented
NC0307 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,342 $1,456 Not Implemented
NC0307 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $313 $381 Not Implemented
NC0307 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,171 $100 Implemented
NC0273 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $705 $500 Not Implemented
NC0273 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $232 $83 Implemented