IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

193

matching recommendations
Reset
NAICS 337127 Institutional Furniture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0213 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $5,181 $18,250 Not Implemented
UU0212 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,326 $21,555 Not Implemented
UU0213 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,602 $1,773 Not Implemented
UU0213 # 01 Y:2023 01 2023 USE POWER DURING OFF-PEAK PERIODS $7,487 $8,000 Not Implemented
UU0212 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $382 $1,370 Not Implemented
UU0212 # 06 Y:2023 06 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $425 $850 Not Implemented
UF0559 # 05 Y:2020 05 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,600 $3,317 Implemented
UF0559 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $602 $0 Implemented
UF0559 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,767 $956 Implemented
UF0559 # 02 Y:2020 02 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $19,566 $32,210 Implemented
UF0559 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,328 $5,468 Implemented
UF0559 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $42,076 $359,360 Not Implemented
UF0559 # 04 Y:2020 04 2020 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $3,003 $750 Implemented
UF0559 # 08 Y:2020 08 2020 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $5,262 $7,180 Implemented
NC0607 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $468 $1,500 Implemented
NC0607 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,655 $10,125 Implemented
NC0607 # 01 Y:2018 01 2018 INSTALL OCCUPANCY SENSORS $436 $797 Implemented
NC0607 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $487 $200 Implemented
NC0607 # 02 Y:2018 02 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $805 $1,000 Implemented
NC0607 # 06 Y:2018 06 2018 DEVELOP A REPAIR/REPLACE POLICY $1,097 $5,865 Implemented
UM0484 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $989 $3,700 n/a
UM0484 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,737 $20,000 n/a
UM0484 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,643 $5,000 n/a
UM0484 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,743 $3,000 n/a
UM0484 # 05 Y:2017 05 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,399 $325 n/a