IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
Reset
NAICS 3379 Other Furniture Related Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0380 # 05 Y:2006 05 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $459 $3,193 Not Implemented
AS0386 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,031 $120 Implemented
AS0386 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,011 $15 Implemented
AS0386 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $639 $1,350 Implemented
AS0386 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $205 $254 Not Implemented
AS0386 # 05 Y:2004 05 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $7,680 $2,000 Not Implemented
AS0386 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $437 $850 Not Implemented
AS0386 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,758 $35,730 Implemented
WI0463 # 01 Y:2004 01 2004 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $75,927 $18,500 Not Implemented
WI0463 # 02 Y:2004 02 2004 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $17,690 $17,690 Not Implemented
WI0463 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $15,360 $2,000 Not Implemented
WI0463 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,859 $29,148 Not Implemented
WI0463 # 05 Y:2004 05 2004 UPGRADE CONTROLS ON COMPRESSORS $11,920 $12,595 Not Implemented
WI0463 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,605 $840 Not Implemented
WI0463 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,530 $15,200 Not Implemented
MS0245 # 01 Y:2004 01 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $82,017 $6,780 Not Implemented
MS0245 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,496 $15,583 Not Implemented
MS0245 # 03 Y:2004 03 2004 REPLACE BOILER $6,523 $4,642 Not Implemented
MS0245 # 04 Y:2004 04 2004 USE PHOTOCELL CONTROLS $3,354 $1,036 Not Implemented
MS0245 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,071 $156 Implemented
MS0245 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,263 $1,542 Not Implemented
MS0245 # 07 Y:2004 07 2004 INSTALL TIMERS AND/OR THERMOSTATS $216 $355 Not Implemented
MS0245 # 08 Y:2004 08 2004 DISCONNECT BALLASTS $93 $180 Implemented
UU0054 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $170 $698 n/a
UU0054 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $185 $130 n/a