IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
NAICS 339 Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0299 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,478 $8,003 n/a
TT0299 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,491 $40 n/a
TT0299 # 07 Y:2023 07 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $387 $100 n/a
TT0299 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $9,312 $22,135 n/a
TT0299 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,097 $30 n/a
TT0299 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $221 $90 n/a
TT0299 # 05 Y:2023 05 2023 REDUCE HEAT GAIN BY WINDOW TINTING $809 $3,500 n/a
TT0299 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $632 $750 n/a
TT0208 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $439 $600 Not Implemented
TT0208 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,732 $2,250 Not Implemented
TT0208 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $3,716 $2,030 Not Implemented
TT0208 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,089 $400 Implemented
TT0208 # 02 Y:2018 02 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,000 $2,500 Not Implemented
TT0208 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,976 $33,750 Not Implemented
TT0179 # 05 Y:2016 05 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,568 $4,800 Implemented
TT0179 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $167 $195 Not Implemented
TT0179 # 09 Y:2016 09 2016 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $319 $421 Not Implemented
TT0179 # 08 Y:2016 08 2016 DEVELOP A REPAIR/REPLACE POLICY $415 $1,064 Not Implemented
TT0179 # 07 Y:2016 07 2016 UPGRADE CONTROLS ON COMPRESSORS $802 $2,000 Not Implemented
TT0179 # 06 Y:2016 06 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,325 $0 Not Implemented
TT0179 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,217 $0 Implemented
TT0179 # 03 Y:2016 03 2016 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,391 $0 Implemented
TT0179 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $6,035 $0 Implemented
TT0179 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,880 $54,314 Not Implemented
TT0140 # 05 Y:2014 05 2014 OPTIMIZE PLANT POWER FACTOR $25,238 $36,000 Implemented