IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 3391 Medical Equipment and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2314 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $2,702 $800 Implemented
MA0840 # 05 Y:2022 05 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,635 $1,000 Implemented
MA0840 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $2,180 $699 Implemented
MA0812 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,774 $16,650 Implemented
MA0812 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,190 $5,960 Implemented
MA0812 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,615 $32,940 Implemented
MA0804 # 05 Y:2019 05 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,134 $1,000 Implemented
MA0804 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,014 $300 Implemented
MA0804 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $100,108 $144,760 Implemented
MA0789 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,415 $29,288 Implemented
MA0662 # 07 Y:2010 07 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $680 $2,000 Implemented
MA0662 # 08 Y:2010 08 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $644 $640 Implemented
MA0662 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $547 $1,740 Implemented
MA0662 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $883 $1,500 Implemented
MA0662 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $1,011 $1,760 Implemented
MA0662 # 02 Y:2010 02 2010 REDUCE VENTILATION AIR $2,158 $3,935 Implemented
MA0662 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,395 $2,265 Implemented
MA0638 # 03 Y:2008 03 2008 REDUCE VENTILATION AIR $12,360 $2,500 Implemented
MA0638 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,761 $0 Implemented
MA0638 # 08 Y:2008 08 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $1,670 $3,000 Implemented
MA0638 # 10 Y:2008 10 2008 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,230 $2,000 Implemented
MA0589 # 03 Y:2006 03 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,300 $4,000 Implemented
MA0589 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $187 $60 Implemented
MA0589 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $2,060 $1,800 Implemented
MA0589 # 06 Y:2006 06 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,951 $400 Implemented