IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

367

matching recommendations
Reset
NAICS 339112 Surgical and Medical Instrument Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0610 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $94 $100 Implemented
SF0331 # 01 Y:2006 01 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,466 $169 Implemented
SF0331 # 02 Y:2006 02 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $16,440 $3,828 Implemented
SF0331 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,535 $4,389 Implemented
SF0331 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $371 $888 Implemented
CO0581 # 01 Y:2006 01 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,180 $450 Implemented
MA0589 # 03 Y:2006 03 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,300 $4,000 Implemented
MA0589 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,311 $3,565 Implemented
MA0589 # 06 Y:2006 06 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,951 $400 Implemented
MA0589 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $2,060 $1,800 Implemented
MA0589 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $187 $60 Implemented
MA0589 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $177 $800 Implemented
TA0107 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,800 $4,390 Implemented
TA0107 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,100 $128 Implemented
TA0107 # 03 Y:2005 03 2005 UPGRADE CONTROLS ON COMPRESSORS $900 $300 Implemented
MI0111 # 02 Y:2005 02 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,290 $84 Implemented
MI0111 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,062 $7,706 Implemented
IA0361 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,729 $429 Implemented
IA0361 # 03 Y:2005 03 2005 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $919 $172 Implemented
IA0361 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,960 $1,114 Implemented
IA0361 # 05 Y:2005 05 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $421 $850 Implemented
SF0295 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $2,378 $0 Implemented
SF0295 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,565 $7,217 Implemented
SF0295 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,996 $5,126 Implemented
LE0198 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,500 $2,500 Implemented