Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
367
matching recommendationsNAICS | 339112 | Surgical and Medical Instrument Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0610 # 06 Y:2007 | 06 | 2007 | INSULATE BARE EQUIPMENT | $94 | $100 | Implemented |
SF0331 # 01 Y:2006 | 01 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,466 | $169 | Implemented |
SF0331 # 02 Y:2006 | 02 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $16,440 | $3,828 | Implemented |
SF0331 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,535 | $4,389 | Implemented |
SF0331 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $371 | $888 | Implemented |
CO0581 # 01 Y:2006 | 01 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,180 | $450 | Implemented |
MA0589 # 03 Y:2006 | 03 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,300 | $4,000 | Implemented |
MA0589 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,311 | $3,565 | Implemented |
MA0589 # 06 Y:2006 | 06 | 2006 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,951 | $400 | Implemented |
MA0589 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $2,060 | $1,800 | Implemented |
MA0589 # 08 Y:2006 | 08 | 2006 | INSULATE BARE EQUIPMENT | $187 | $60 | Implemented |
MA0589 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $177 | $800 | Implemented |
TA0107 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,800 | $4,390 | Implemented |
TA0107 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,100 | $128 | Implemented |
TA0107 # 03 Y:2005 | 03 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $900 | $300 | Implemented |
MI0111 # 02 Y:2005 | 02 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,290 | $84 | Implemented |
MI0111 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,062 | $7,706 | Implemented |
IA0361 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,729 | $429 | Implemented |
IA0361 # 03 Y:2005 | 03 | 2005 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $919 | $172 | Implemented |
IA0361 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,960 | $1,114 | Implemented |
IA0361 # 05 Y:2005 | 05 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $421 | $850 | Implemented |
SF0295 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,378 | $0 | Implemented |
SF0295 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,565 | $7,217 | Implemented |
SF0295 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,996 | $5,126 | Implemented |
LE0198 # 02 Y:2004 | 02 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,500 | $2,500 | Implemented |