IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

367

matching recommendations
Reset
NAICS 339112 Surgical and Medical Instrument Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0315 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,093 $5,340 Implemented
UU0118 # 02 Y:2017 02 2017 USE OPTIMUM TEMPERATURE $7,381 $0 Implemented
SD0549 # 01 Y:2017 01 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $49,288 $204,000 Implemented
SD0549 # 02 Y:2017 02 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,056 $3,882 Implemented
SD0549 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,048 $4,352 Implemented
SD0549 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $638 $600 Implemented
SD0549 # 05 Y:2017 05 2017 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $360 $300 Implemented
UU0116 # 06 Y:2017 06 2017 INSTALL SPECTRAL REFLECTORS / DELAMP $901 $142 Implemented
UU0116 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,534 $2,402 Implemented
UU0116 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,863 $0 Implemented
UU0116 # 08 Y:2017 08 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $59,018 $500 Implemented
SD0530 # 01 Y:2016 01 2016 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $14,594 $36,400 Implemented
SD0530 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,344 $1,500 Implemented
SD0530 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,876 $200 Implemented
SD0530 # 04 Y:2016 04 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,261 $861 Implemented
SD0530 # 05 Y:2016 05 2016 INSTALL SKYLIGHTS $1,125 $3,360 Implemented
SD0530 # 06 Y:2016 06 2016 USE PHOTOCELL CONTROLS $1,002 $2,590 Implemented
IP0060 # 01 Y:2016 01 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,498 $30 Implemented
IP0060 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,162 $220 Implemented
IP0060 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,282 $1,568 Implemented
IP0060 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $3,107 $725 Implemented
IP0060 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,749 $638 Implemented
IP0060 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,644 $3,840 Implemented
MI0282 # 02 Y:2015 02 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,822 $10,322 Implemented
MI0282 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,613 $1,660 Implemented