Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsNAICS | 339112 | Surgical and Medical Instrument Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0689 # 11 Y:2025 | 11 | 2025 | INSULATE BARE EQUIPMENT | $234 | $786 | n/a |
WV0689 # 10 Y:2025 | 10 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $576 | $700 | n/a |
WV0689 # 09 Y:2025 | 09 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $826 | $1,390 | n/a |
WV0689 # 08 Y:2025 | 08 | 2025 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $866 | $4,000 | n/a |
WV0689 # 07 Y:2025 | 07 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $962 | $4,680 | n/a |
WV0689 # 06 Y:2025 | 06 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $1,571 | $2,065 | n/a |
WV0689 # 05 Y:2025 | 05 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,146 | $4,200 | n/a |
WV0689 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,151 | $3,917 | n/a |
WV0689 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,908 | $28,814 | n/a |
WV0689 # 02 Y:2025 | 02 | 2025 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $16,980 | $75,000 | n/a |
WV0689 # 01 Y:2025 | 01 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $23,841 | $12,250 | n/a |
MS0447 # 02 Y:2025 | 02 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $80,000 | $30,005 | n/a |
MS0447 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $668,474 | $6,707,386 | n/a |
MS0447 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $56,915 | $6,958 | n/a |
MS0447 # 04 Y:2025 | 04 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $43,724 | $145,930 | n/a |
MS0447 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $144,047 | $116,128 | n/a |
MS0447 # 06 Y:2025 | 06 | 2025 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $2,030,279 | $11,484,200 | n/a |
OR0806 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $3,880 | $211 | n/a |
OR0806 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $56,788 | $960,069 | n/a |
OR0806 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,490 | $1,927 | n/a |
OR0806 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,542 | $5,699 | n/a |
OR0806 # 05 Y:2025 | 05 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $15,683 | $76,301 | n/a |
SD0664 # 05 Y:2025 | 05 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $107,677 | $47,756 | n/a |
SD0664 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $564,124 | $638,912 | n/a |
SD0664 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $82,562 | $4,772 | n/a |