Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
156
matching recommendationsNAICS | 339113 | Surgical Appliance and Supplies Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0179 # 05 Y:2016 | 05 | 2016 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,568 | $4,800 | Implemented |
TT0179 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,217 | $0 | Implemented |
TT0179 # 03 Y:2016 | 03 | 2016 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $5,391 | $0 | Implemented |
TT0179 # 02 Y:2016 | 02 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,035 | $0 | Implemented |
LE0399 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,126 | $7,367 | Implemented |
LE0399 # 01 Y:2015 | 01 | 2015 | INSTALL OCCUPANCY SENSORS | $2,461 | $240 | Implemented |
LE0399 # 02 Y:2015 | 02 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,851 | $250 | Implemented |
LE0399 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,048 | $1,000 | Implemented |
SF0466 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,015 | $5,614 | Implemented |
SF0466 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,885 | $5,614 | Implemented |
SF0466 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,752 | $2,224 | Implemented |
SF0466 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $5,556 | $6,409 | Implemented |
SF0466 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,026 | $4,733 | Implemented |
UD0919 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,715 | $0 | Implemented |
UD0919 # 01 Y:2015 | 01 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,757 | $0 | Implemented |
UD0919 # 07 Y:2015 | 07 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $11,674 | $0 | Implemented |
UD0919 # 04 Y:2015 | 04 | 2015 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $29,266 | $9,200 | Implemented |
UD0919 # 03 Y:2015 | 03 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,936 | $50 | Implemented |
UD0919 # 02 Y:2015 | 02 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,792 | $0 | Implemented |
SU0378 # 02 Y:2015 | 02 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $700 | $0 | Implemented |
SU0378 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,702 | $500 | Implemented |
TT0140 # 09 Y:2014 | 09 | 2014 | DISCONNECT BALLASTS | $358 | $50 | Implemented |
TT0140 # 02 Y:2014 | 02 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,068 | $1,545 | Implemented |
TT0140 # 08 Y:2014 | 08 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,333 | $50 | Implemented |
TT0140 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,206 | $125 | Implemented |