Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
148
matching recommendationsNAICS | 339113 | Surgical Appliance and Supplies Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0466 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,015 | $5,614 | Implemented |
SF0466 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,885 | $5,614 | Implemented |
SF0466 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,752 | $2,224 | Implemented |
SF0466 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $5,556 | $6,409 | Implemented |
SF0466 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,026 | $4,733 | Implemented |
UD0919 # 01 Y:2015 | 01 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,757 | $0 | Implemented |
UD0919 # 02 Y:2015 | 02 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,792 | $0 | Implemented |
UD0919 # 03 Y:2015 | 03 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,936 | $50 | Implemented |
UD0919 # 04 Y:2015 | 04 | 2015 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $29,266 | $9,200 | Implemented |
UD0919 # 07 Y:2015 | 07 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $11,674 | $0 | Implemented |
UD0919 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,715 | $0 | Implemented |
SU0378 # 02 Y:2015 | 02 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $700 | $0 | Implemented |
SU0378 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,702 | $500 | Implemented |
TT0140 # 01 Y:2014 | 01 | 2014 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $3,000 | $2,000 | Implemented |
TT0140 # 02 Y:2014 | 02 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,068 | $1,545 | Implemented |
TT0140 # 05 Y:2014 | 05 | 2014 | OPTIMIZE PLANT POWER FACTOR | $25,238 | $36,000 | Implemented |
TT0140 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,206 | $125 | Implemented |
TT0140 # 08 Y:2014 | 08 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,333 | $50 | Implemented |
TT0140 # 09 Y:2014 | 09 | 2014 | DISCONNECT BALLASTS | $358 | $50 | Implemented |
MI0241 # 01 Y:2013 | 01 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $16,509 | $3,900 | Implemented |
MI0241 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,217 | $6,000 | Implemented |
MI0241 # 03 Y:2013 | 03 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,040 | $80 | Implemented |
MI0241 # 04 Y:2013 | 04 | 2013 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,960 | $540 | Implemented |
MI0241 # 05 Y:2013 | 05 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,883 | $4,691 | Implemented |
MI0241 # 06 Y:2013 | 06 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,564 | $440 | Implemented |