Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsNAICS | 3399 | Other Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0144 # 03 Y:2019 | 03 | 2019 | OPTIMIZE PLANT POWER FACTOR | $6,190 | $6,000 | Not Implemented |
UU0144 # 02 Y:2019 | 02 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $16,349 | $400 | Implemented |
UU0144 # 01 Y:2019 | 01 | 2019 | INSULATE BARE EQUIPMENT | $42,296 | $1,068 | Implemented |
AM0648 # 02 Y:2013 | 02 | 2013 | RECYCLE WASTE INK AND CLEANUP SOLVENT | $29,607 | $0 | Implemented |
AM0648 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $52,176 | $5,000 | Implemented |
AM0648 # 03 Y:2013 | 03 | 2013 | OPTIMIZE PLANT POWER FACTOR | $16,856 | $22,350 | Implemented |
AM0648 # 04 Y:2013 | 04 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,740 | $0 | Implemented |
AM0648 # 05 Y:2013 | 05 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,304 | $45,000 | Implemented |
AM0648 # 06 Y:2013 | 06 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,059 | $167 | Implemented |
AM0648 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,544 | $18,524 | Implemented |
AM0648 # 11 Y:2013 | 11 | 2013 | INSULATE BARE EQUIPMENT | $101 | $308 | Not Implemented |
AM0648 # 10 Y:2013 | 10 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,116 | $9 | Implemented |
AM0648 # 09 Y:2013 | 09 | 2013 | USE SYNTHETIC LUBRICANT | $2,016 | $0 | Implemented |
AM0648 # 08 Y:2013 | 08 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,230 | $500 | Implemented |
UU0073 # 06 Y:2004 | 06 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $10,500 | $15,000 | Not Implemented |
UU0073 # 01 Y:2004 | 01 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $8,250 | $8,000 | Not Implemented |
UU0073 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,080 | $860 | Not Implemented |
UU0073 # 03 Y:2004 | 03 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $990 | $6,000 | Not Implemented |
UU0073 # 04 Y:2004 | 04 | 2004 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $2,434 | $0 | Not Implemented |
UU0073 # 05 Y:2004 | 05 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,700 | $2,500 | Not Implemented |
UU0073 # 07 Y:2004 | 07 | 2004 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $130 | $0 | Not Implemented |
UU0070 # 01 Y:2004 | 01 | 2004 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,370,474 | $22,000,000 | Not Implemented |
UU0070 # 02 Y:2004 | 02 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $95,199 | $0 | Implemented |
UU0070 # 03 Y:2004 | 03 | 2004 | OPTIMIZE PLANT POWER FACTOR | $16,729 | $26,520 | Not Implemented |
UU0070 # 04 Y:2004 | 04 | 2004 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $73,401 | $750,000 | Implemented |